A 240 hp (power-shift) dozer is used in a pushing operation. The dozer is equipped with a straight blade. The material (dry and noncohesive) weighs 98 pcf in the bank state. It is estimated the material will swell 6%, from bank to loose state. The center-of mass-to-center- of-mass pushing distance is 180 ft. Job efficiency can be assumed to be equivalent to a 45-min hour. Calculate the production in bcy per hour and the direct cost of the proposed earthmoving operation in dollars per bcy. The company's normal O&O cost for these machines is $100 per hour and the operator's wage is $20.00 per hour plus 40% for fringes, insurance, and worker's compensation.

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
Question

Please answer and show your work step by step.

 
A 240 hp (power-shift) dozer is used in a pushing
operation. The dozer is equipped with a straight blade.
The material (dry and noncohesive) weighs 98 pcf in the
bank state. It is estimated the material will swell 6%,
from bank to loose state. The center-of mass-to-center-
of-mass pushing distance is 180 ft. Job efficiency can be
assumed to be equivalent to a 45-min hour.
Calculate the production in bcy per hour and the direct
cost of the proposed earthmoving operation in dollars
per bcy. The company's normal O&O cost for these
machines is $100 per hour and the operator's wage is
$20.00 per hour plus 40% for fringes, insurance, and
worker's compensation.
Transcribed Image Text:A 240 hp (power-shift) dozer is used in a pushing operation. The dozer is equipped with a straight blade. The material (dry and noncohesive) weighs 98 pcf in the bank state. It is estimated the material will swell 6%, from bank to loose state. The center-of mass-to-center- of-mass pushing distance is 180 ft. Job efficiency can be assumed to be equivalent to a 45-min hour. Calculate the production in bcy per hour and the direct cost of the proposed earthmoving operation in dollars per bcy. The company's normal O&O cost for these machines is $100 per hour and the operator's wage is $20.00 per hour plus 40% for fringes, insurance, and worker's compensation.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Applied Fluid Mechanics
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY