9. A work operation consisting of three (3) elements has been subjected to a time study. The recorded observations are shown below. The allowance factor for personal time is 5%, delay is 5%, and fatigue is 10%. Determine the standard time for the work operations. Observation (in Minutes) Element 1 2 456 Rating (%) 0.1 0.3 0.2 0.9 0.2 0.1 0.8 0.6 0.8 0.5 3.2 0.7 0.5 0.5 0.4 0.5 0.6 0.5 Job Performance A 90 110 80 10. The preliminary work sample of an operation indicates the following: what is the required sample size for a three (3) sigma with 4% accuracy. No. of times operator working 60 No. of times operator idle 40
note: answer all items ..
10. The preliminary work sample of an operation indicates the following; what is the required sample
size for a three (3) sigma with 4% accuracy.
No. of times operator working 60
No. of times operator idle 40
11. PJ Sumeguin, Inc. produces telephone system with built in TV screens. Its learning rate is 80%.
a. If the first one took 56hrs, how long will it take the company to complete the 11th unit?
b. How long will the 1st 11 systems take in total?
c. If you are the purchasing agent, you are expected to buy units 12 through 15 of the new
phone systems. What would be your expected cost for the units if company charges $30
for each labor hour?
12. Margarette Tire shop simulated the following data below. How much is his expected daily
demand?
Demand for Tires Frequency
0 10
1 20
2 40
3 60
4 40
5 30
Step by step
Solved in 3 steps with 1 images