7. A -3% grade meets a +5% grade near an underpass. In order to maintain the minimum clearance allowed under the bridge and at the same time introduce a vertical transitioning curve in the grade line, it is necessary to use a curve that lies 200-m on one side of the vertex of the straight grade and 100-m on the other. The stationing of the beginning of the curve (200-m side) is 10+000 and elevation is 228m. a.) Determine the stationing of the lowest point of the curve. b.) Determine the elevation at STA 10+040. c.) If the uphill edge of the underside of the bridge is at station 10+220 and at elevation 229.206m, what is the vertical clearance under the bridge at this point?
7. A -3% grade meets a +5% grade near an underpass. In order to maintain the minimum clearance allowed under the bridge and at the same time introduce a vertical transitioning curve in the grade line, it is necessary to use a curve that lies 200-m on one side of the vertex of the straight grade and 100-m on the other. The stationing of the beginning of the curve (200-m side) is 10+000 and elevation is 228m. a.) Determine the stationing of the lowest point of the curve. b.) Determine the elevation at STA 10+040. c.) If the uphill edge of the underside of the bridge is at station 10+220 and at elevation 229.206m, what is the vertical clearance under the bridge at this point?
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question

Transcribed Image Text:7. A -3% grade meets a +5% grade near an underpass. In order to maintain the minimum
clearance allowed under the bridge and at the same time introduce a vertical transitioning curve
in the grade line, it is necessary to use a curve that lies 200-m on one side of the vertex of the
straight grade and 100-m on the other. The stationing of the beginning of the curve (200-m side)
is 10+000 and elevation is 228m.
a.) Determine the stationing of the lowest point of the curve.
b.) Determine the elevation at STA 10+040.
c.) If the uphill edge of the underside of the bridge is at station 10+220 and at elevation 229.206m,
what is the vertical clearance under the bridge at this point?
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 3 images

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning