6. Consider the product structure diagram given in Figure 8–3. Assume that the MPS for the end item for weeks 10 through 17 is Week 10 11 12 13 14 15 16 17 Net requirements 100 100 40 40 100 200 200 200 Assume that lot-for-lot scheduling is used throughout. Also assume that there is no entering inventory in period 10 and no scheduled receipts. a. Determine the planned order release for component A. b. Determine the planned order release for component B. c. Determine the planned order release for component C. (Hint: Note that C is required for both A and B.)
Unitary Method
The word “unitary” comes from the word “unit”, which means a single and complete entity. In this method, we find the value of a unit product from the given number of products, and then we solve for the other number of products.
Speed, Time, and Distance
Imagine you and 3 of your friends are planning to go to the playground at 6 in the evening. Your house is one mile away from the playground and one of your friends named Jim must start at 5 pm to reach the playground by walk. The other two friends are 3 miles away.
Profit and Loss
The amount earned or lost on the sale of one or more items is referred to as the profit or loss on that item.
Units and Measurements
Measurements and comparisons are the foundation of science and engineering. We, therefore, need rules that tell us how things are measured and compared. For these measurements and comparisons, we perform certain experiments, and we will need the experiments to set up the devices.
Trending now
This is a popular solution!
Step by step
Solved in 7 steps with 7 images