5. Based on one-dimensional consolidation test results on a clay, the coefficient of consolidation for a given pressure range was obtained as 9x 10-3 mm²/s. In the field, there is a 4 m-thick layer of the same clay with one-way drainage. Based on the assumption that a uniform surcharge of 90 kN/m2 was to be applied instantaneously, the total consolidation settlement was estimated to be 160 mm. However, during the construction, the loading was gradual; the resulting surcharge can be approximated as Estimate the settlement at (a) t-45 day and (b) 150 days. kN 90 a(m²) = 90t kN 9 (m²) = 90 for t ≤90 days for t > 90 days

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Question
**Problem Statement:**

Based on one-dimensional consolidation test results on a clay, the coefficient of consolidation for a given pressure range was obtained as \(9 \times 10^{-3} \, \text{mm}^2/\text{s}\). In the field, there is a 4 m-thick layer of the same clay with one-way drainage. Based on the assumption that a uniform surcharge of \(90 \, \text{kN/m}^2\) was to be applied instantaneously, the total consolidation settlement was estimated to be 160 mm.

However, during the construction, the loading was gradual; the resulting surcharge can be approximated as:

\[
q \left( \frac{\text{kN}}{\text{m}^2} \right) = \frac{90}{90} t \quad \text{for } t \leq 90 \text{ days}
\]

\[
q \left( \frac{\text{kN}}{\text{m}^2} \right) = 90 \quad \text{for } t > 90 \text{ days}
\]

**Tasks:**

Estimate the settlement at 

(a) \(t = 45\) days and 

(b) \(t = 150\) days.
Transcribed Image Text:**Problem Statement:** Based on one-dimensional consolidation test results on a clay, the coefficient of consolidation for a given pressure range was obtained as \(9 \times 10^{-3} \, \text{mm}^2/\text{s}\). In the field, there is a 4 m-thick layer of the same clay with one-way drainage. Based on the assumption that a uniform surcharge of \(90 \, \text{kN/m}^2\) was to be applied instantaneously, the total consolidation settlement was estimated to be 160 mm. However, during the construction, the loading was gradual; the resulting surcharge can be approximated as: \[ q \left( \frac{\text{kN}}{\text{m}^2} \right) = \frac{90}{90} t \quad \text{for } t \leq 90 \text{ days} \] \[ q \left( \frac{\text{kN}}{\text{m}^2} \right) = 90 \quad \text{for } t > 90 \text{ days} \] **Tasks:** Estimate the settlement at (a) \(t = 45\) days and (b) \(t = 150\) days.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 14 images

Blurred answer
Knowledge Booster
Consolidation parameters
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning