4) What's the cost of an LNG facility in Western Australia with all utility systems, acid gas removal, dehydration, mercury removal, LPG processing, and CO2 treatment given that the base facility was $680/MTPA? LNG Plant Type (4.5 MTPA Capacity) 1) Minimum feedgas treatment and imported utilities 2) Plant 1 plus all utility systems CAPEX Factor 1.00 1.25 3) Plant 2 plus acid gas removal, dehydration, mercury 1.64 4) Plant 3 plus LPG processing, storage, and loading 5) Plant 4 plus CO₂ treatment & sequestering 1.99 2.44 2.93 6) Plant 5 plus max LPG recovery and sulphur recovery $USD/ MTPA facility in Western Australia

Introduction to Chemical Engineering Thermodynamics
8th Edition
ISBN:9781259696527
Author:J.M. Smith Termodinamica en ingenieria quimica, Hendrick C Van Ness, Michael Abbott, Mark Swihart
Publisher:J.M. Smith Termodinamica en ingenieria quimica, Hendrick C Van Ness, Michael Abbott, Mark Swihart
Chapter1: Introduction
Section: Chapter Questions
Problem 1.1P
icon
Related questions
Question
What's the cost of an LNG facility in Western Australia with all utility systems, acid gas removal, dehydration,
mercury removal, LPG processing, and CO2 treatment given that the base facility was $680/ MTPA?
4) What's the cost of an LNG facility in Western Australia with all utility systems, acid gas removal, dehydration,
mercury removal, LPG processing, and CO2 treatment given that the base facility was $680/MTPA?
LNG Plant Type (4.5 MTPA Capacity)
1) Minimum feedgas treatment and imported utilities
2) Plant 1 plus all utility systems
CAPEX Factor
1.00
1.25
3) Plant 2 plus acid gas removal, dehydration, mercury
1.64
4) Plant 3 plus LPG processing, storage, and loading
5) Plant 4 plus CO₂ treatment & sequestering
1.99
2.44
2.93
6) Plant 5 plus max LPG recovery and sulphur recovery
$USD/ MTPA facility in Western Australia
Transcribed Image Text:4) What's the cost of an LNG facility in Western Australia with all utility systems, acid gas removal, dehydration, mercury removal, LPG processing, and CO2 treatment given that the base facility was $680/MTPA? LNG Plant Type (4.5 MTPA Capacity) 1) Minimum feedgas treatment and imported utilities 2) Plant 1 plus all utility systems CAPEX Factor 1.00 1.25 3) Plant 2 plus acid gas removal, dehydration, mercury 1.64 4) Plant 3 plus LPG processing, storage, and loading 5) Plant 4 plus CO₂ treatment & sequestering 1.99 2.44 2.93 6) Plant 5 plus max LPG recovery and sulphur recovery $USD/ MTPA facility in Western Australia
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
Recommended textbooks for you
Introduction to Chemical Engineering Thermodynami…
Introduction to Chemical Engineering Thermodynami…
Chemical Engineering
ISBN:
9781259696527
Author:
J.M. Smith Termodinamica en ingenieria quimica, Hendrick C Van Ness, Michael Abbott, Mark Swihart
Publisher:
McGraw-Hill Education
Elementary Principles of Chemical Processes, Bind…
Elementary Principles of Chemical Processes, Bind…
Chemical Engineering
ISBN:
9781118431221
Author:
Richard M. Felder, Ronald W. Rousseau, Lisa G. Bullard
Publisher:
WILEY
Elements of Chemical Reaction Engineering (5th Ed…
Elements of Chemical Reaction Engineering (5th Ed…
Chemical Engineering
ISBN:
9780133887518
Author:
H. Scott Fogler
Publisher:
Prentice Hall
Process Dynamics and Control, 4e
Process Dynamics and Control, 4e
Chemical Engineering
ISBN:
9781119285915
Author:
Seborg
Publisher:
WILEY
Industrial Plastics: Theory and Applications
Industrial Plastics: Theory and Applications
Chemical Engineering
ISBN:
9781285061238
Author:
Lokensgard, Erik
Publisher:
Delmar Cengage Learning
Unit Operations of Chemical Engineering
Unit Operations of Chemical Engineering
Chemical Engineering
ISBN:
9780072848236
Author:
Warren McCabe, Julian C. Smith, Peter Harriott
Publisher:
McGraw-Hill Companies, The