3. The data refer to 5 suppliers of the Levi-Strauss clothing manufacturing plant in Albuquerque. The firm's quality control department collects weekly data on percentage waste y (run-up). The sample means (;) and sample standard deviations S; are given in the JMP output below (last table) for each supplier (labeled as 1, 2, 3, 4, 5). Response Run-Up v Residual by Predicted Plot DOneway Analysis of Run-Up By Supplier Plant Number 20 25 15 10 20 -5 15 -10 -15 -20 -25 10 5- -15 -10 -5 10 15 20 25 Run-Up Predicted - Residual Normal Quantile Plot -5 20 -10- 15 -15 2 4 10 ... Supplier Plant Number Oneway Anova v Analysis of Variance Sum of Squares Mean Square 544.6349 F Ratio Prob > F 3.6566 Source DF Supplier Plant Number Error C. Total - Means and Std Deviations 4 136.159 0.0084" -5 88 3276.7896 37.236 92 3821.4245 -10 - Std Err Level Number Mean Std Dev Mean Lower 95% Upper 95% -15 - 21 2.7047619 5.4155772 1.1817758 0.2396207 2.6829071 2.7093228 5.1699031 21 5.9095238 7.0884346 1.5468232 9.1361405 -20 19 4.8315789 4.4031621 1.0101547 6.9538351 9.252136 16.15097 4 19 7.4894737 3.6570928 0.8389946 5.7268114 13 10.376923 9.5550296 2.6500884 4.6028765 Normal Quantile dn-uny Run-Up Residual Run-Up Residual 0.05 0.1 - -66'0

MATLAB: An Introduction with Applications
6th Edition
ISBN:9781119256830
Author:Amos Gilat
Publisher:Amos Gilat
Chapter1: Starting With Matlab
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Site image for background.

Suppose all assumptios hold for the ne-way ANOVA model. Give a single numerical value which provides an estimate of the standard deviation of percentage waste (run-up) for any supplier.

3. The data refer to 5 suppliers of the Levi-Strauss clothing manufacturing plant in Albuquerque. The
firm's quality control department collects weekly data on percentage waste y (run-up).
The sample means (;) and sample standard deviations S; are given in the JMP output below (last
table) for each supplier (labeled as 1, 2, 3, 4, 5).
Response Run-Up
v Residual by Predicted Plot
DOneway Analysis of Run-Up By Supplier Plant Number
20
25
15
10
20
-5
15
-10
-15
-20
-25
10
5-
-15
-10
-5
10
15
20
25
Run-Up Predicted
- Residual Normal Quantile Plot
-5
20
-10-
15
-15
2
4
10
...
Supplier Plant Number
Oneway Anova
v Analysis of Variance
Sum of
Squares Mean Square
544.6349
F Ratio Prob > F
3.6566
Source
DF
Supplier Plant Number
Error
C. Total
- Means and Std Deviations
4
136.159
0.0084"
-5
88 3276.7896
37.236
92 3821.4245
-10 -
Std Err
Level Number
Mean
Std Dev
Mean Lower 95% Upper 95%
-15 -
21 2.7047619 5.4155772 1.1817758
0.2396207
2.6829071
2.7093228
5.1699031
21 5.9095238 7.0884346 1.5468232
9.1361405
-20
19 4.8315789 4.4031621 1.0101547
6.9538351
9.252136
16.15097
4
19 7.4894737 3.6570928 0.8389946
5.7268114
13 10.376923 9.5550296 2.6500884
4.6028765
Normal Quantile
dn-uny
Run-Up Residual
Run-Up Residual
0.05
0.1 -
-66'0
Transcribed Image Text:3. The data refer to 5 suppliers of the Levi-Strauss clothing manufacturing plant in Albuquerque. The firm's quality control department collects weekly data on percentage waste y (run-up). The sample means (;) and sample standard deviations S; are given in the JMP output below (last table) for each supplier (labeled as 1, 2, 3, 4, 5). Response Run-Up v Residual by Predicted Plot DOneway Analysis of Run-Up By Supplier Plant Number 20 25 15 10 20 -5 15 -10 -15 -20 -25 10 5- -15 -10 -5 10 15 20 25 Run-Up Predicted - Residual Normal Quantile Plot -5 20 -10- 15 -15 2 4 10 ... Supplier Plant Number Oneway Anova v Analysis of Variance Sum of Squares Mean Square 544.6349 F Ratio Prob > F 3.6566 Source DF Supplier Plant Number Error C. Total - Means and Std Deviations 4 136.159 0.0084" -5 88 3276.7896 37.236 92 3821.4245 -10 - Std Err Level Number Mean Std Dev Mean Lower 95% Upper 95% -15 - 21 2.7047619 5.4155772 1.1817758 0.2396207 2.6829071 2.7093228 5.1699031 21 5.9095238 7.0884346 1.5468232 9.1361405 -20 19 4.8315789 4.4031621 1.0101547 6.9538351 9.252136 16.15097 4 19 7.4894737 3.6570928 0.8389946 5.7268114 13 10.376923 9.5550296 2.6500884 4.6028765 Normal Quantile dn-uny Run-Up Residual Run-Up Residual 0.05 0.1 - -66'0
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Point Estimation, Limit Theorems, Approximations, and Bounds
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, statistics and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
MATLAB: An Introduction with Applications
MATLAB: An Introduction with Applications
Statistics
ISBN:
9781119256830
Author:
Amos Gilat
Publisher:
John Wiley & Sons Inc
Probability and Statistics for Engineering and th…
Probability and Statistics for Engineering and th…
Statistics
ISBN:
9781305251809
Author:
Jay L. Devore
Publisher:
Cengage Learning
Statistics for The Behavioral Sciences (MindTap C…
Statistics for The Behavioral Sciences (MindTap C…
Statistics
ISBN:
9781305504912
Author:
Frederick J Gravetter, Larry B. Wallnau
Publisher:
Cengage Learning
Elementary Statistics: Picturing the World (7th E…
Elementary Statistics: Picturing the World (7th E…
Statistics
ISBN:
9780134683416
Author:
Ron Larson, Betsy Farber
Publisher:
PEARSON
The Basic Practice of Statistics
The Basic Practice of Statistics
Statistics
ISBN:
9781319042578
Author:
David S. Moore, William I. Notz, Michael A. Fligner
Publisher:
W. H. Freeman
Introduction to the Practice of Statistics
Introduction to the Practice of Statistics
Statistics
ISBN:
9781319013387
Author:
David S. Moore, George P. McCabe, Bruce A. Craig
Publisher:
W. H. Freeman