3. The data refer to 5 suppliers of the Levi-Strauss clothing manufacturing plant in Albuquerque. The firm's quality control department collects weekly data on percentage waste y (run-up). The sample means (;) and sample standard deviations S; are given in the JMP output below (last table) for each supplier (labeled as 1, 2, 3, 4, 5). Response Run-Up v Residual by Predicted Plot DOneway Analysis of Run-Up By Supplier Plant Number 20 25 15 10 20 -5 15 -10 -15 -20 -25 10 5- -15 -10 -5 10 15 20 25 Run-Up Predicted - Residual Normal Quantile Plot -5 20 -10- 15 -15 2 4 10 ... Supplier Plant Number Oneway Anova v Analysis of Variance Sum of Squares Mean Square 544.6349 F Ratio Prob > F 3.6566 Source DF Supplier Plant Number Error C. Total - Means and Std Deviations 4 136.159 0.0084" -5 88 3276.7896 37.236 92 3821.4245 -10 - Std Err Level Number Mean Std Dev Mean Lower 95% Upper 95% -15 - 21 2.7047619 5.4155772 1.1817758 0.2396207 2.6829071 2.7093228 5.1699031 21 5.9095238 7.0884346 1.5468232 9.1361405 -20 19 4.8315789 4.4031621 1.0101547 6.9538351 9.252136 16.15097 4 19 7.4894737 3.6570928 0.8389946 5.7268114 13 10.376923 9.5550296 2.6500884 4.6028765 Normal Quantile dn-uny Run-Up Residual Run-Up Residual 0.05 0.1 - -66'0

MATLAB: An Introduction with Applications
6th Edition
ISBN:9781119256830
Author:Amos Gilat
Publisher:Amos Gilat
Chapter1: Starting With Matlab
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Site image for background.

Suppose all assumptios hold for the ne-way ANOVA model. Give a single numerical value which provides an estimate of the standard deviation of percentage waste (run-up) for any supplier.

3. The data refer to 5 suppliers of the Levi-Strauss clothing manufacturing plant in Albuquerque. The
firm's quality control department collects weekly data on percentage waste y (run-up).
The sample means (;) and sample standard deviations S; are given in the JMP output below (last
table) for each supplier (labeled as 1, 2, 3, 4, 5).
Response Run-Up
v Residual by Predicted Plot
DOneway Analysis of Run-Up By Supplier Plant Number
20
25
15
10
20
-5
15
-10
-15
-20
-25
10
5-
-15
-10
-5
10
15
20
25
Run-Up Predicted
- Residual Normal Quantile Plot
-5
20
-10-
15
-15
2
4
10
...
Supplier Plant Number
Oneway Anova
v Analysis of Variance
Sum of
Squares Mean Square
544.6349
F Ratio Prob > F
3.6566
Source
DF
Supplier Plant Number
Error
C. Total
- Means and Std Deviations
4
136.159
0.0084"
-5
88 3276.7896
37.236
92 3821.4245
-10 -
Std Err
Level Number
Mean
Std Dev
Mean Lower 95% Upper 95%
-15 -
21 2.7047619 5.4155772 1.1817758
0.2396207
2.6829071
2.7093228
5.1699031
21 5.9095238 7.0884346 1.5468232
9.1361405
-20
19 4.8315789 4.4031621 1.0101547
6.9538351
9.252136
16.15097
4
19 7.4894737 3.6570928 0.8389946
5.7268114
13 10.376923 9.5550296 2.6500884
4.6028765
Normal Quantile
dn-uny
Run-Up Residual
Run-Up Residual
0.05
0.1 -
-66'0
Transcribed Image Text:3. The data refer to 5 suppliers of the Levi-Strauss clothing manufacturing plant in Albuquerque. The firm's quality control department collects weekly data on percentage waste y (run-up). The sample means (;) and sample standard deviations S; are given in the JMP output below (last table) for each supplier (labeled as 1, 2, 3, 4, 5). Response Run-Up v Residual by Predicted Plot DOneway Analysis of Run-Up By Supplier Plant Number 20 25 15 10 20 -5 15 -10 -15 -20 -25 10 5- -15 -10 -5 10 15 20 25 Run-Up Predicted - Residual Normal Quantile Plot -5 20 -10- 15 -15 2 4 10 ... Supplier Plant Number Oneway Anova v Analysis of Variance Sum of Squares Mean Square 544.6349 F Ratio Prob > F 3.6566 Source DF Supplier Plant Number Error C. Total - Means and Std Deviations 4 136.159 0.0084" -5 88 3276.7896 37.236 92 3821.4245 -10 - Std Err Level Number Mean Std Dev Mean Lower 95% Upper 95% -15 - 21 2.7047619 5.4155772 1.1817758 0.2396207 2.6829071 2.7093228 5.1699031 21 5.9095238 7.0884346 1.5468232 9.1361405 -20 19 4.8315789 4.4031621 1.0101547 6.9538351 9.252136 16.15097 4 19 7.4894737 3.6570928 0.8389946 5.7268114 13 10.376923 9.5550296 2.6500884 4.6028765 Normal Quantile dn-uny Run-Up Residual Run-Up Residual 0.05 0.1 - -66'0
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Point Estimation, Limit Theorems, Approximations, and Bounds
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, statistics and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
MATLAB: An Introduction with Applications
MATLAB: An Introduction with Applications
Statistics
ISBN:
9781119256830
Author:
Amos Gilat
Publisher:
John Wiley & Sons Inc
Probability and Statistics for Engineering and th…
Probability and Statistics for Engineering and th…
Statistics
ISBN:
9781305251809
Author:
Jay L. Devore
Publisher:
Cengage Learning
Statistics for The Behavioral Sciences (MindTap C…
Statistics for The Behavioral Sciences (MindTap C…
Statistics
ISBN:
9781305504912
Author:
Frederick J Gravetter, Larry B. Wallnau
Publisher:
Cengage Learning
Elementary Statistics: Picturing the World (7th E…
Elementary Statistics: Picturing the World (7th E…
Statistics
ISBN:
9780134683416
Author:
Ron Larson, Betsy Farber
Publisher:
PEARSON
The Basic Practice of Statistics
The Basic Practice of Statistics
Statistics
ISBN:
9781319042578
Author:
David S. Moore, William I. Notz, Michael A. Fligner
Publisher:
W. H. Freeman
Introduction to the Practice of Statistics
Introduction to the Practice of Statistics
Statistics
ISBN:
9781319013387
Author:
David S. Moore, George P. McCabe, Bruce A. Craig
Publisher:
W. H. Freeman