29' 9" ation. 34' 0" Bucket Wall Plan Excavator Information 2.3 ft³ Ift=12in 27ft = lyd Continuous concrete footing 1'9 36 Section of wall plan

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Give correct answer and show all steps. Subject is construction engineering
**Educational Content: Footing Excavation Estimation**

The image provides a detailed plan and section drawing with specifications for estimating the hours required for footing excavation.

### Wall Plan
- **Dimensions**: 
  - Length: 34 feet 0 inches
  - Width: 29 feet 9 inches

### Section of Wall Plan
- **Wall Height**: 7 feet 3 inches
- **Wall Thickness**: 11 inches
- **Footing Dimensions**:
  - Width: 3 feet 6 inches
  - Depth: 1 foot 9 inches (beneath ground level)
  - Additional Ground Depth: 2 feet 6 inches
- **Footing Type**: Continuous concrete

### Excavator Information
- **Bucket Capacity**: 2.3 cubic feet
- **Cycle of Operation**: 40 seconds per cycle
- **Efficiency**: 40 minutes per hour

### Additional Notes
- 1 foot equals 12 inches
- 27 feet equals 1 yard

These details help in calculating the total volume of excavation required and estimating the time based on the excavator's capacity and efficiency.
Transcribed Image Text:**Educational Content: Footing Excavation Estimation** The image provides a detailed plan and section drawing with specifications for estimating the hours required for footing excavation. ### Wall Plan - **Dimensions**: - Length: 34 feet 0 inches - Width: 29 feet 9 inches ### Section of Wall Plan - **Wall Height**: 7 feet 3 inches - **Wall Thickness**: 11 inches - **Footing Dimensions**: - Width: 3 feet 6 inches - Depth: 1 foot 9 inches (beneath ground level) - Additional Ground Depth: 2 feet 6 inches - **Footing Type**: Continuous concrete ### Excavator Information - **Bucket Capacity**: 2.3 cubic feet - **Cycle of Operation**: 40 seconds per cycle - **Efficiency**: 40 minutes per hour ### Additional Notes - 1 foot equals 12 inches - 27 feet equals 1 yard These details help in calculating the total volume of excavation required and estimating the time based on the excavator's capacity and efficiency.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 1 images

Blurred answer
Knowledge Booster
Historic projects
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning