2: Děšign and Analysis - make sure to show all calculations, correct units and box answers for all problems. Problem 1 : Scrapers will deliver to the project 500 lcy per hr of fill material (dry clay). A self-propelled tamping foot roller will be used to compact the fill. (Rolling width is 84 in.) The fill material will be placed in 4 inch compacted lifts. The loose lift is about 10 inches. Test strip compaction information indicates that 8 passes at 4 mph are required to obtain the required density. Assume a 55 min working hour. Q1: Calculate the roller production in CCY/hr. 22: Determine the number of rollers required to support the scraper operation.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
2: Děšign and Analysis - make sure to show all calculations, correct units and box answers for all problems.
Problem 1
: Scrapers will deliver to the project 500 lcy per hr of fill material (dry clay). A self-propelled
tamping foot roller will be used to compact the fill. (Rolling width is 84 in.) The fill material will be placed in 4
inch compacted lifts. The loose lift is about 10 inches. Test strip compaction information indicates that 8 passes
at 4 mph are required to obtain the required density. Assume a 55 min working hour.
Q1: Calculate the roller production in CCY/hr.
22: Determine the number of rollers required to support the scraper operation.
Transcribed Image Text:2: Děšign and Analysis - make sure to show all calculations, correct units and box answers for all problems. Problem 1 : Scrapers will deliver to the project 500 lcy per hr of fill material (dry clay). A self-propelled tamping foot roller will be used to compact the fill. (Rolling width is 84 in.) The fill material will be placed in 4 inch compacted lifts. The loose lift is about 10 inches. Test strip compaction information indicates that 8 passes at 4 mph are required to obtain the required density. Assume a 55 min working hour. Q1: Calculate the roller production in CCY/hr. 22: Determine the number of rollers required to support the scraper operation.
Expert Solution
steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Methods of ground improvement
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning