17. The time-phased net requirements for the base assembly in a table lamp over the next six weeks are Week 1 3. 4 Requirements 335 200 140 440 300 200 The setup cost for the construction of the base assembly is $200, and the hold- ing cost is $0.30 per assembly per week. a. What lot sizing do you obtain from the EOQ formula? b. Determine the lot sizes using the Silver-Meal heuristic. c. Determine the lot sizes using the least unit cost heuristic. d. Determine the lot sizes using part period balancing. e. Compare the holding and setup costs obtained over the six periods using the poli- cies found in parts (a) through (d) with the cost of a lot-for-lot policy.

MATLAB: An Introduction with Applications
6th Edition
ISBN:9781119256830
Author:Amos Gilat
Publisher:Amos Gilat
Chapter1: Starting With Matlab
Section: Chapter Questions
Problem 1P
icon
Related questions
Topic Video
Question

Answer only sub parts d and e.

17. The time-phased net requirements for the base assembly in a table lamp over the
next six weeks are
Week
1
3.
4
6.
Requirements
335
200
140
440
300
200
The setup cost for the construction of the base assembly is $200, and the hold-
ing cost is $0.30 per assembly per week.
a. What lot sizing do you obtain from the EOQ formula?
b. Determine the lot sizes using the Silver-Meal heuristic.
c. Determine the lot sizes using the least unit cost heuristic.
d. Determine the lot sizes using part period balancing.
e. Compare the holding and setup costs obtained over the six periods using the poli-
cies found in parts (a) through (d) with the cost of a lot-for-lot policy.
Transcribed Image Text:17. The time-phased net requirements for the base assembly in a table lamp over the next six weeks are Week 1 3. 4 6. Requirements 335 200 140 440 300 200 The setup cost for the construction of the base assembly is $200, and the hold- ing cost is $0.30 per assembly per week. a. What lot sizing do you obtain from the EOQ formula? b. Determine the lot sizes using the Silver-Meal heuristic. c. Determine the lot sizes using the least unit cost heuristic. d. Determine the lot sizes using part period balancing. e. Compare the holding and setup costs obtained over the six periods using the poli- cies found in parts (a) through (d) with the cost of a lot-for-lot policy.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Permutation and Combination
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, statistics and related others by exploring similar questions and additional content below.
Recommended textbooks for you
MATLAB: An Introduction with Applications
MATLAB: An Introduction with Applications
Statistics
ISBN:
9781119256830
Author:
Amos Gilat
Publisher:
John Wiley & Sons Inc
Probability and Statistics for Engineering and th…
Probability and Statistics for Engineering and th…
Statistics
ISBN:
9781305251809
Author:
Jay L. Devore
Publisher:
Cengage Learning
Statistics for The Behavioral Sciences (MindTap C…
Statistics for The Behavioral Sciences (MindTap C…
Statistics
ISBN:
9781305504912
Author:
Frederick J Gravetter, Larry B. Wallnau
Publisher:
Cengage Learning
Elementary Statistics: Picturing the World (7th E…
Elementary Statistics: Picturing the World (7th E…
Statistics
ISBN:
9780134683416
Author:
Ron Larson, Betsy Farber
Publisher:
PEARSON
The Basic Practice of Statistics
The Basic Practice of Statistics
Statistics
ISBN:
9781319042578
Author:
David S. Moore, William I. Notz, Michael A. Fligner
Publisher:
W. H. Freeman
Introduction to the Practice of Statistics
Introduction to the Practice of Statistics
Statistics
ISBN:
9781319013387
Author:
David S. Moore, George P. McCabe, Bruce A. Craig
Publisher:
W. H. Freeman