1.- You have the following manufacturing system: A B с 5% 15% M M1 M2 20% 20% E G 40% D H 40% M3 I 10% 60% F J 90% M4 K 15% L 85% Knowing that: * flow L denotes an OK (sellable) output; flows C, E, I, and K denote NOK (scraped) lots. * the selling price of OK (sellable) output = 10 ($/lot). * the cost of NOK (scraped) lot = 1 (S/lot). * the input rates - for A and B - are 5 lot/hr and 15 lot/hr (respectively). , calculate the total profit achieved in one hour ($/hr). 2.- For the previous manufacturing system, assume now that the service rate - for each Mi - is the following: M1 => µl = 4 lot/hr M2 => μ2 = 6 lot/hr M3 =>u3 = 8 lot/hr M4 => μ4= 5 lot/hr , calculate the value of incoming flows A and B so no Mi exceeds a Utilization (U) of 100%.

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
Question

ANSWER ONLY QUESTION 2)

ANSWER ONLY QUESTION 2)

 

 

1.- You have the following manufacturing system:
A
B
с 5%
15%
M
M1
M2
20%
20% ▼ E
G
40%
D H
40%
M3
I 10%
60% F
J
90%
M4
K 15%
L
85%
Knowing that:
* flow L denotes an OK (sellable) output; flows C, E, I, and K denote NOK (scraped) lots.
*the selling price of OK (sellable) output = 10 ($/lot).
* the cost of NOK (scraped) lot = 1 ($/lot).
* the input rates - for A and B - are 5 lot/hr and 15 lot/hr (respectively).
, calculate the total profit achieved in one hour ($/hr).
2.- For the previous manufacturing system, assume now that the service rate - for each Mi - is the following:
M1 => µ1 = 4 lot/hr
M2 => µ26 lot/hr
M3 => µ3 8 lot/hr
M4 => µ4= 5 lot/hr
calculate the value of incoming flows A and B so no Mi exceeds a Utilization (U) of 100%.
Transcribed Image Text:1.- You have the following manufacturing system: A B с 5% 15% M M1 M2 20% 20% ▼ E G 40% D H 40% M3 I 10% 60% F J 90% M4 K 15% L 85% Knowing that: * flow L denotes an OK (sellable) output; flows C, E, I, and K denote NOK (scraped) lots. *the selling price of OK (sellable) output = 10 ($/lot). * the cost of NOK (scraped) lot = 1 ($/lot). * the input rates - for A and B - are 5 lot/hr and 15 lot/hr (respectively). , calculate the total profit achieved in one hour ($/hr). 2.- For the previous manufacturing system, assume now that the service rate - for each Mi - is the following: M1 => µ1 = 4 lot/hr M2 => µ26 lot/hr M3 => µ3 8 lot/hr M4 => µ4= 5 lot/hr calculate the value of incoming flows A and B so no Mi exceeds a Utilization (U) of 100%.
Expert Solution
steps

Step by step

Solved in 3 steps with 5 images

Blurred answer
Knowledge Booster
Entropy
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY