1. The Great Pyramid of King Khufu was built of limestone in Egypt over a 20-year time period from 2580 BC to 2560 BC. Its base is a square with side length 756 ft and its height when built was 481 ft. (It was the tallest man-made structure in the world for more than 3800 years.) Assume that the density of the limestone used was about 150 lb/cubic ft. 2x (a) Estimate the total work done in building the pyramid. (Hint: Draw a side view of the pyramid to find a relationship between the height and width at any level of the pyramid.) You should set up an integral for this value, explaining how you set it up, and then integrate by hand, showing each step, and evaluating at the limits using the Fundamental Theorem of Calculus (rather than just using a calculator). (b) If each laborer worked 10 hours a day for 20 years, for 340 days a year, and did 200 ft-lb /hour of work in lifting the limestone blocks into place, about how many laborers were needed to construct the pyramid?

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
100%
1. The Great Pyramid of King Khufu was built of limestone in Egypt over a 20-year time period from 2580
BC to 2560 BC. Its base is a square with side length 756 ft and its height when built was 481 ft. (It was
the tallest man-made structure in the world for more than 3800 years.) Assume that the density of the
limestone used was about 150 lb/cubic ft.
2x
2x
(a) Estimate the total work done in building the pyramid. (Hint: Draw a side view of the pyramid to find a
relationship between the height and width at any level of the pyramid.) You should set up an integral for
this value, explaining how you set it up, and then integrate by hand, showing each step, and evaluating at
the limits using the Fundamental Theorem of Calculus (rather than just using a calculator).
(b) If each laborer worked 10 hours a day for 20 years, for 340 days a year, and did 200 ft-lb /hour of work
in lifting the limestone blocks into place, about how many laborers were needed to construct the pyramid?
Transcribed Image Text:1. The Great Pyramid of King Khufu was built of limestone in Egypt over a 20-year time period from 2580 BC to 2560 BC. Its base is a square with side length 756 ft and its height when built was 481 ft. (It was the tallest man-made structure in the world for more than 3800 years.) Assume that the density of the limestone used was about 150 lb/cubic ft. 2x 2x (a) Estimate the total work done in building the pyramid. (Hint: Draw a side view of the pyramid to find a relationship between the height and width at any level of the pyramid.) You should set up an integral for this value, explaining how you set it up, and then integrate by hand, showing each step, and evaluating at the limits using the Fundamental Theorem of Calculus (rather than just using a calculator). (b) If each laborer worked 10 hours a day for 20 years, for 340 days a year, and did 200 ft-lb /hour of work in lifting the limestone blocks into place, about how many laborers were needed to construct the pyramid?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 3 images

Blurred answer
Similar questions
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,