1. Taking soil samples and testing the soil properties takes an engineer an average of 35.5 days per project. The duration varies because of differences in the soil, site terrain, and site location, and the variability of the engineer's productivity. The duration follows a normal distribution with a standard deviation of 1.9 days. When asked how long it will take the engineer to do the work on the next project, the engineer feels optimistic and says "34 days". a. What is the probability that the work will be completed within this duration? b. What is the probability that the work will take longer than this duration? c. What duration should the engineer say to ensure with 95% confidence that the duration will not be exceeded? d. If the engineer wanted to increase the confidence level that the duration would not be exceeded, what could they do?

A First Course in Probability (10th Edition)
10th Edition
ISBN:9780134753119
Author:Sheldon Ross
Publisher:Sheldon Ross
Chapter1: Combinatorial Analysis
Section: Chapter Questions
Problem 1.1P: a. How many different 7-place license plates are possible if the first 2 places are for letters and...
icon
Related questions
Question
i need the answer quickly
1. Taking soil samples and testing the soil properties takes an engineer an average of 35.5 days
per project. The duration varies because of differences in the soil, site terrain, and site
location, and the variability of the engineer's productivity. The duration follows a normal
distribution with a standard deviation of 1.9 days. When asked how long it will take the
engineer to do the work on the next project, the engineer feels optimistic and says "34 days".
What is the probability that the work will be completed within this duration?
b. What is the probability that the work will take longer than this duration?
c. What duration should the engineer say to ensure with 95% confidence that the
а.
duration will not be exceeded?
d. If the engineer wanted to increase the confidence level that the duration would not be
exceeded, what could they do?
Transcribed Image Text:1. Taking soil samples and testing the soil properties takes an engineer an average of 35.5 days per project. The duration varies because of differences in the soil, site terrain, and site location, and the variability of the engineer's productivity. The duration follows a normal distribution with a standard deviation of 1.9 days. When asked how long it will take the engineer to do the work on the next project, the engineer feels optimistic and says "34 days". What is the probability that the work will be completed within this duration? b. What is the probability that the work will take longer than this duration? c. What duration should the engineer say to ensure with 95% confidence that the а. duration will not be exceeded? d. If the engineer wanted to increase the confidence level that the duration would not be exceeded, what could they do?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Recommended textbooks for you
A First Course in Probability (10th Edition)
A First Course in Probability (10th Edition)
Probability
ISBN:
9780134753119
Author:
Sheldon Ross
Publisher:
PEARSON
A First Course in Probability
A First Course in Probability
Probability
ISBN:
9780321794772
Author:
Sheldon Ross
Publisher:
PEARSON