1. PT ABC produces disinfectant by mixing 2 chemical solutions for mixing in a machine to become a disinfectant solution (Solution I and Solution 2). Solution I is the first process which is carried out at workstation A for 0.5 minutes per solution then continued at workstation B for 0.2 minutes per solution. Then solution I was mixed together with Solution 2 at workstation C for 0.8 minutes per solution. Workstations B and C are processed at workstation D for mixing together where the process takes X minutes per solution until it becomes a disinfectant solution to be sold to customers. a. Which workstation is a bottleneck? Explain with a picture of the workstation. b. What is the resulting time (throughput time) from the work system above? c. How much disinfectant solution can a company produce per hour?

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter4: Linear Programming Models
Section: Chapter Questions
Problem 111P
icon
Related questions
Question

Please Answer My Question Operations Management 1 A,B,C because I Know The Tutor Can Answer max 3 Sub Parts... Because Every Sub Part Of The Problem Is Related To Each Other....Thank U and No Reject

1. PT ABC produces disinfectant by mixing 2 chemical solutions for mixing in a machine to become a
disinfectant solution (Solution I and Solution 2). Solution I is the first process which is carried out at workstation
A for 0.5 minutes per solution then continued at workstation B for 0.2 minutes per solution. Then solution I was
mixed together with Solution 2 at workstation C for 0.8 minutes per solution. Workstations B and C are
processed at workstation D for mixing together where the process takes X minutes per solution until it becomes
a disinfectant solution to be sold to customers.
a. Which workstation is a bottleneck? Explain with a picture of the workstation.
b. What is the resulting time (throughput time) from the work system above?
c. How much disinfectant solution can a company produce per hour?
Note X = 2
Transcribed Image Text:1. PT ABC produces disinfectant by mixing 2 chemical solutions for mixing in a machine to become a disinfectant solution (Solution I and Solution 2). Solution I is the first process which is carried out at workstation A for 0.5 minutes per solution then continued at workstation B for 0.2 minutes per solution. Then solution I was mixed together with Solution 2 at workstation C for 0.8 minutes per solution. Workstations B and C are processed at workstation D for mixing together where the process takes X minutes per solution until it becomes a disinfectant solution to be sold to customers. a. Which workstation is a bottleneck? Explain with a picture of the workstation. b. What is the resulting time (throughput time) from the work system above? c. How much disinfectant solution can a company produce per hour? Note X = 2
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Process selection
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,