1. From the following cross section notes where SS is 1.5H:1V and width of highway is 20.00 meters at every station. Determine the following: a. Total road volume using end area b. Total road volume using prismoidal formula c. Total road volume using prismoidal correction End Area Method: A, + A, |·L V = Cross -Section Notes STA 5+100 - 6.2 -6.0 -12.0 -5.3 0.0 -4.0 10.0 -8.8 -X X Prosmodal Formula STA 5+175 - 4.2 -5.0 -8.0 -6.5 0.0 -2.0 8.0 -7.6 -X V = (A,+ 4A, + A,)/6 x L m Draw the cross-section of profile of roadway per station. Prismodal Correction Note: Show Full solution and use the formula. Use 4 decimal places. Do not copy in chegg, It is wrong Volume =L/12 ( C1-C2)(D1- D2) Topic: Highway Alignment and Earthworks

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

7.2 Highway Engineering: Highway Alignments and Earthworks (Read the notes below)

1. From the following cross section notes where SS is 1.5H:1V and width of highway is 20.00 meters at every station.
Determine the following:
a. Total road volume using end area
b. Total road volume using prismoidal formula
c. Total road volume using prismoidal correction
End Area Method:
A, + A2
V =
·L
Cross -Section Notes
2
STA 5+100
- 6.2
-6.0
-12.0
-4.0
10.0
-8.8
-5.3
0.0
-X
Prosmodal Formula
- 4.2
出
STA 5+175
-5.0
-8.0
-6.5
0.0
-2.0
8.0
-7.6
-X
V = (A,+ 4Am + A,)/6 x L
Draw the cross-section of profile of roadway per station.
Prismodal Correction
Note: Show Full solution and use the formula.
Use 4 decimal places.
Do not copy in chegg, It is wrong
Volume =L/12 ( C1 - C2)(D1 - D2)
Topic: Highway Alignment and Earthworks
Transcribed Image Text:1. From the following cross section notes where SS is 1.5H:1V and width of highway is 20.00 meters at every station. Determine the following: a. Total road volume using end area b. Total road volume using prismoidal formula c. Total road volume using prismoidal correction End Area Method: A, + A2 V = ·L Cross -Section Notes 2 STA 5+100 - 6.2 -6.0 -12.0 -4.0 10.0 -8.8 -5.3 0.0 -X Prosmodal Formula - 4.2 出 STA 5+175 -5.0 -8.0 -6.5 0.0 -2.0 8.0 -7.6 -X V = (A,+ 4Am + A,)/6 x L Draw the cross-section of profile of roadway per station. Prismodal Correction Note: Show Full solution and use the formula. Use 4 decimal places. Do not copy in chegg, It is wrong Volume =L/12 ( C1 - C2)(D1 - D2) Topic: Highway Alignment and Earthworks
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Geometric design of highway facilities
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning