1. A production line is producing electrical components. Under normal conditions 2.4% of the components are defective. To monitor production, a sample of 18 components is taken each hour. If the number of defectives becomes too high, the production line is stopped and adjustments are made. (a) What distribution applies to the number of defectives in a sample? (b) Write down specifically the null hypothesis and the alternative hypothesis. (c) For 1% level of significance, what is the smallest number of defectives in the sample which should shut down the production line? 2. In problem 1 the probability that any 1 component will be defective has increased to 6.3%. Now what is the probability of a Type Il error?

MATLAB: An Introduction with Applications
6th Edition
ISBN:9781119256830
Author:Amos Gilat
Publisher:Amos Gilat
Chapter1: Starting With Matlab
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
answer number 2 only
1. A production line is producing electrical components. Under normal conditions
2.4% of the components are defective. To monitor production, a sample of 18
components is taken each hour. If the number of defectives becomes too high, the
production line is stopped and adjustments are made.
(a) What distribution applies to the number of defectives in a sample?
(b) Write down specifically the null hypothesis and the alternative hypothesis.
(c) For 1% level of significance, what is the smallest number of defectives in the
sample which should shut down the production line?
2. In problem 1 the probability that any 1 component will be defective has increased
to 6.3%. Now what is the probability of a Type Il error?
Transcribed Image Text:1. A production line is producing electrical components. Under normal conditions 2.4% of the components are defective. To monitor production, a sample of 18 components is taken each hour. If the number of defectives becomes too high, the production line is stopped and adjustments are made. (a) What distribution applies to the number of defectives in a sample? (b) Write down specifically the null hypothesis and the alternative hypothesis. (c) For 1% level of significance, what is the smallest number of defectives in the sample which should shut down the production line? 2. In problem 1 the probability that any 1 component will be defective has increased to 6.3%. Now what is the probability of a Type Il error?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Recommended textbooks for you
MATLAB: An Introduction with Applications
MATLAB: An Introduction with Applications
Statistics
ISBN:
9781119256830
Author:
Amos Gilat
Publisher:
John Wiley & Sons Inc
Probability and Statistics for Engineering and th…
Probability and Statistics for Engineering and th…
Statistics
ISBN:
9781305251809
Author:
Jay L. Devore
Publisher:
Cengage Learning
Statistics for The Behavioral Sciences (MindTap C…
Statistics for The Behavioral Sciences (MindTap C…
Statistics
ISBN:
9781305504912
Author:
Frederick J Gravetter, Larry B. Wallnau
Publisher:
Cengage Learning
Elementary Statistics: Picturing the World (7th E…
Elementary Statistics: Picturing the World (7th E…
Statistics
ISBN:
9780134683416
Author:
Ron Larson, Betsy Farber
Publisher:
PEARSON
The Basic Practice of Statistics
The Basic Practice of Statistics
Statistics
ISBN:
9781319042578
Author:
David S. Moore, William I. Notz, Michael A. Fligner
Publisher:
W. H. Freeman
Introduction to the Practice of Statistics
Introduction to the Practice of Statistics
Statistics
ISBN:
9781319013387
Author:
David S. Moore, George P. McCabe, Bruce A. Craig
Publisher:
W. H. Freeman