Review Test Submission: Chapter 11 Test Question 1 1 out of 1 points General contractors, specialty contractors, and material suppliers employ __________ who read prints and sp Selected Answer: estimators Correct Answer: Evaluation Method Correct Answer Exact Match estimators Question 2 1 out of 1 points __________ improvements are changes to a site that include footings, foundations, basements, and other bel Selected Answer: engineering Correct Answer: Evaluation Method Correct Answer Exact Match Engineering Question 3 1 out of 1 points Quantity takeoff for excavation is commonly calculated in square yards. Selected Answer: False Correct Answer: False Question 4 1 out of 1 points Rafters with a 4" in 12" pitch have a 12.65" run per foot. Selected Answer: True Correct Answer: True Question 5 1 out of 1 points The amount of welded wire reinforcement required is based on the slab __________. Selected Answer: area Correct Answer: area Question 6 1 out of 1 points
A(n) __________ is a horizontal member used to align and reinforce concrete formwork. Selected Answer: waler Correct Answer: Evaluation Method Correct Answer Exact Match waler Question 7 1 out of 1 points Items such as girders, beams, engineered lumber, and trusses are counted as individual units on a quantity takeoff. Selected Answer: True Correct Answer: True Question 8 1 out of 1 points __________ is the process of lowering high spots and filling in low spots of earth at a construction site. Selected Answer: Grading Correct Answer: Grading Question 9 1 out of 1 points A __________ waste allowance is added to concrete calculations to allow for spillage during placement. Selected Answer: 1% to 2% Correct Answer: 1% to 2% Question 10 1 out of 1 points Interior __________ and related schedules provide location, dimension, and finish information for cabinetry. Selected Answer: elevations Correct Answer: Evaluation Method Correct Answer Exact Match elevations Pattern Match (?i)elevations?( drawings Question 11
1 out of 1 points A(n) __________ denotes the size and type of patented forms, quantity of each, amount of fastening hardware Selected Answer: formwork schedule Correct Answer: Evaluation Method Correct Answer Exact Match formwork schedule Pattern Match (?i)form-?work[\s-]sched Question 12 1 out of 1 points Trim moldings, such as baseboard, casing, chair rail, and crown molding, are taken off in __________. Selected Answer: linear feet Correct Answer: linear feet Question 13 1 out of 1 points To calculate the linear feet of lumber for single top and bottom form plates on both sides of a wall, multiply the linear feet of the wall by 4. Selected Answer: True Correct Answer: True Question 14 1 out of 1 points When calculating the number of linear feet of plate material for walls with double top plates, the sum of the wa Selected Answer: 3 Correct Answer: Evaluation Method Correct Answer Exact Match 3 Exact Match three Question 15 1 out of 1 points A typical sheet of wood paneling measures __________' perpendicular to the direction of the grain and 8' para Selected Answer: 4 Correct Answer: Evaluation Method Correct Answer
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Exact Match 4 Pattern Match (?i)4('| ?(ft\.?|feet))? Pattern Match (?i)four( (ft\.?|feet))? Question 16 1 out of 1 points Quantity takeoffs for carpet and resilient flooring are calculated in square feet. Selected Answer: False Correct Answer: False Question 17 1 out of 1 points Rebar placement, spacing, and sizing are determined from __________ or sections. Selected Answer: details Correct Answer: Evaluation Method Correct Answer Exact Match details Question 18 1 out of 1 points Quantity takeoff for piping and ductwork is performed in ________ for each type of pipe or duct required. Selected Answer: linear feet Correct Answer: Evaluation Method Correct Answer Exact Match linear feet Pattern Match (?i)linear[\s-](ft|ft.|feet) Question 19 1 out of 1 points One snap tie for each 4 sq ft of wall area is typically recommended for cast-in-place concrete walls. Selected Answer: True Correct Answer: True Question 20 1 out of 1 points Joist spacing and direction is noted on __________. Selected Answer: floor plans Correct Answer:
floor plans Question 21 1 out of 1 points The amount of concrete required for a job site is specified in cubic feet measurements. Selected Answer: False Correct Answer: False Question 22 1 out of 1 points Hardwood flooring and tile quantity takeoffs are typically calculated in __________. Selected Answer: square feet Correct Answer: Evaluation Method Correct Answer Exact Match square feet Pattern Match (?i)(sqft|((sq|sq.|square)\ Question 23 1 out of 1 points A square of shingles covers 100 sq ft. Selected Answer: True Correct Answer: True Question 24 1 out of 1 points Information concerning the type and design of concrete formwork is not provided on a typical set of prints. Selected Answer: True Correct Answer: True Question 25 1 out of 1 points __________ drawings indicate the form identification numbers of the manufacturer, type of formwork, placeme Selected Answer: formwork Correct Answer: Evaluation Method Correct Answer Exact Match Formwork Pattern Match (?i)formwork([\s-]drawin Question 26 1 out of 1 points
Bituminous and elastomeric roofing are taken off using the same method. Selected Answer: True Correct Answer: True Question 27 1 out of 1 points The approximate elevation at each corner of a grid is established by using the nearest contour line. Selected Answer: True Correct Answer: True Question 28 1 out of 1 points A multiplier of __________ is used to determine the actual number of joists required for a project when the jois Selected Answer: .625 Correct Answer: Evaluation Method Correct Answer Exact Match 0.625 Exact Match .625 Exact Match 5/8 Question 29 1 out of 1 points __________ is the division of a plot plan for large areas to be excavated or graded into small squares. Selected Answer: gridding Correct Answer: Evaluation Method Correct Answer Exact Match Gridding Question 30 1 out of 1 points Junction boxes, receptacles, fixtures, and other electrical apparatus must be spaced in a manner that meets or exceeds the National Electrical Code® requirements. Selected Answer: True Correct Answer: True Question 31 1 out of 1 points A(n) __________ is the practice of reviewing contract documents only to determine quantities of material to be included in a bid.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Selected Answer: takeoff Correct Answer: takeoff Question 32 1 out of 1 points When calculating the number of metal studs required for a wall, a(n) __________ multiplier is used for 16" OC Selected Answer: .75 Correct Answer: Evaluation Method Correct Answer Exact Match 0.75 Pattern Match (?i)(3/4|0?\.75) Question 33 1 out of 1 points Structural lumber length is rounded up to the closest __________' dimension for purchasing. Selected Answer: 2 Correct Answer: Evaluation Method Correct Answer Exact Match 2 Pattern Match (?i)2('| ?(ft\.?|feet))? Pattern Match (?i)two( (ft\.?|feet))? Question 34 1 out of 1 points A waste factor of __________% is added for composition shingles. Selected Answer: 10% Correct Answer: Evaluation Method Correct Answer Exact Match 10 Pattern Match (?i)10(%|\spercent)? Pattern Match (?i)ten(\spercent)? Question 35 1 out of 1 points A(n) __________ line is a line connecting points on a topographical map where existing and planned elevations are equal. Selected Answer:
zero Correct Answer: zero Question 36 1 out of 1 points Structural lumber length is rounded up to the closest __________' for purchasing. Selected Answer: 2 Correct Answer: Evaluation Method Correct Answer Exact Match 2 Pattern Match (?i)2('|\s?(ft|ft.|feet))? Pattern Match (?i)two(\s(ft|ft.|feet))? Question 37 1 out of 1 points A round pipe column shown on a print as 8 SCH 60 indicates an 8" diameter (nominal) schedule 60 pipe is used. Selected Answer: True Correct Answer: True Question 38 1 out of 1 points A(n) __________ scale or plan dimensions are utilized to determine the approximate lengths of electrical runs Selected Answer: architect's Correct Answer: Evaluation Method Correct Answer Exact Match architect's Pattern Match (?i)architect('?s)? Question 39 1 out of 1 points EIFS is a wood panel product that is fastened to wall framing members and painted. Selected Answer: False Correct Answer: False Question 40 1 out of 1 points __________ and door schedules are the primary sources of information about doors. Selected Answer: floor plans
Correct Answer: Evaluation Method Correct Answer Exact Match Floor plans Pattern Match (?i)floor[ -]?plans? Monday, December 4, 2023 10:26:48 AM EST