Question 1 of 7.
For the following sustainability concern, select the most appropriate IPS element impacted:
The Air Force’s new fighter requires higher ground power voltage for maintenance than
legacy aircraft.
Supply Support
Facilities and Infrastructure
Support Equipment
Sustaining Engineering
Question 2 of 7.
In a Product Support Business Case Analysis (BCA), select two areas where data analytics
can impact Product Support Management decision making.
Vendor availability
Cost Estimation
Component Item Unique Identification (IUID) marking
Performance Data
Question 3 of 7.
During the Log Demo, it is discovered that a design flaw is limiting technicians’ ability to
remove and replace a component under the allotted time. How could this design flaw
impact sustainment outcomes?
Maintainability and Availability will decrease
Production may be delayed
Mean Time to Repair will decrease
Reliability will decrease and require an alternative solution
Question 4 of 7.
The Army’s Light Logistics Support Vehicle (LLSV) replaces all 4 of its tires, on average,
after 32,000 km driven. Based on Section 3.1 of the CAPE’s O&S Cost Element Structure,
estimate the annual cost in tires for the LLSV if there are 200 LLSVs in the fleet, averaging
16,000 km driven per year per vehicle, with tires costing $800 each.
Not enough information is provided
$160,000 per year
$320,000 per year
$80,000 per year
Question 5 of 7.
For the following sustainability concern, select the most appropriate IPS element impacted:
Determining which maintenance tasks should be performed in the field on the Marines
Corps’ new Light Amphibious Assault Vehicle.
Maintenance Planning and Management
Product Support Management
Supply Support
Support Equipment
Question 6 of 7.
For the following sustainability concern, select the most appropriate IPS element impacted:
Updating technical manuals used by uniformed maintenance personnel.
Maintenance Planning and Management
Technical Data
Support Equipment
Supply Support
Question 7 of 7.
Which of the following weapon system’s sustainability metrics would be directly impacted
by an increase in downtime due to poor reliability?
Mean Logistics Delay Time
Mean Corrective Maintenance Time
All are correct
Availability
Your preview ends here