Question 1 of 5.
DoD Instruction 5000.89 provides program managers and testers with tailoring guidance based on the given acquisition pathway within the Adaptive Acquisition Framework. Methods for tailoring might include:
All of the responses are correct
Totally eliminating the need for a Test and Evaluation Master Plan (TEMP) or any other test strategy documentation
Involving contractors in Middle Tier Acquisition ops demos after making the production and fielding decision
Including mission-oriented DT&E with actual operators performing end-to-end scenarios in a controlled environment
Question 2 of 5.
A number of key T&E events take place over the acquisition life cycle (Developmental Test and Evaluation (DT&E), Initial Operational Test and Evaluation (IOT&E), and Follow-On
Test and Evaluation (FOT&E)). When considering the entire acquisition life cycle (without regard to any specific phase), which one of the following represents the order that these events are typically performed? Select the correct answer.
FOT&E, DT&E, IOT&
E
IOT&E, DT&E, FOT&
E
FOT&E, IOT&E, DT&E
DT&E, IOT&E, FOT&
E
Question 3 of 5.
Testing during the first part of the Production and Deployment phase of the DoD acquisition life cycle (Low Rate Initial Production (LRIP)) includes all of the following activities EXCEPT _______. Select the correct answer.
Conducting production qualification (first article) testing
Reviewing Developmental Test and Evaluation (DT&E) information to certify readiness for Initial Operational Test and Evaluation (IOT&E)
Planning for and conducting IOT&E
A
ssessing technical progress against technical parameters
Question 4 of 5.
Which one of the following key T&E activities typically takes place during the Operations and Support phase of the acquisition life cycle? Select the correct answer.
Follow-On Operational Testing (FOT&E)
Extensive testing to evaluate promising prototype technologies
Developmental Test and Evaluation (DT&E)
The start of Initial Operational Test & Evaluation (IOT&E)
Question 5 of 5.
The purposes of Test and Evaluation in defense system development include _____. Select the THREE correct answers.
Provide assessments of system maturity
Help to reduce development and acquisition risks
Assess the operational suitability of a system
Determine if development is over budget
Question 1 of 5.
Which of the following statements describes why testing continues in the Operations and Support phase after a system is successfully deployed? Select the correct answer.
To support analysis of system performance and assist in development of tactics.
To evaluate changes to mission requirements.
To support modifications to the system to take advantage of technology improvements.
All of these responses are correct
.
Mark for follow up
Question 2 of 5.
Testing during the Engineering and Manufacturing Development phase of the DoD acquisition life cycle includes activities primarily focused on _____. Select the correct answer.
Conducting Follow-On Test and Evaluation to verify the continuing effectiveness of a system
Evaluation of various materiel solutions to determine technology risks
Evaluating performance of the fielded system in order to support development of new tactics
Assessing technical progress against technical parameters
Question 3 of 5.
Generally you would expect to see Operational Testing completed on a system before Development Testing is initiated because it helps to refine the user’s operational concepts.
True
Fa
lse
Question 4 of 5.
With regard to T&E for rapid acquisition programs, _______. Select the correct response:
Schedule considerations dominate over cost and technical risk considerations
Cost considerations dominate over schedule and technical risk considerations
Technical risk considerations dominate over schedule and cost considerations
T&E efforts typically increase in scope in order to minimize the risk associated with satisfying urgent warfighter needs.
Question 5 of 5.
The purposes of Test and Evaluation in defense system development include _____. Select the THREE correct answers.
Assess the operational suitability of a system
Help to reduce development and acquisition risks
Provide assessments of system maturity
Determine if development is over budget