clcl 010 test 3

docx

School

Defense Acquisition University *

*We aren’t endorsed by this school

Course

CLCL004

Subject

Industrial Engineering

Date

Jan 9, 2024

Type

docx

Pages

3

Uploaded by eugene5316

Report
Question 1 of 10. What are three technical data items that go into a product Technical Data Package (TDP) for a new Army tank entering production? Computer software source code for the navigation system Engineering 2D drawings of the engine Parts list of the fuel pump Packing details of an electric motor Question 2 of 10. The lube oil purifier for a DDG 51 Class Destroyer failed during production builders trials due to an unreliable bearing. Which three of the following IPS Elements in Page 3, Block 38, of the ECP Form are most likely to be effected? Product Support Management Design Interface Manpower & Personnel Sustaining Engineering Support Equipment Supply Support Other Training & Training Support Facilities & Structure Maintenance Planning & Mgmt Computer Resources Packaging, Handling, Storage, and Transportation (PHS&T) Technical Data Question 3 of 10. A radar subassembly is now obsolete, but the depot team found a replacement subassembly. What two pieces of Logistic Product Data need to be developed or modified for the new subassembly? Select two that apply. Updated System Requirement Specifications Technical manual Supply support information Engineering drawings Question 4 of 10.
What is an example characterized by Cloud storage as, “a sudden spike in the number of online users that needed to review digital engineering drawings?” Resource Pooling On-Demand Self Service Rapid Elasticity Broad Network Assess Question 5 of 10. What logistics product data would be requested by submitting a completed CDRL for a new four ton folk lift to be delivered to the Army? Test Reports Interface Control Drawings System Requirement Specification Preservation and Packing Data Question 6 of 10. You are assigned to review the engineering drawing for the correct format. The drawing is for a type 3D native model. What is your response about the drawing? Drawing is almost correct since it is a blue print Drawing is correct; a 3D native model None of these responses is correct. Not a 3D native model Question 7 of 10. You are assigned as lead logistician to lead a team and to develop an Intellectual Property Strategy concept for a new weapon system. What would you state to the team in terms of an IP data management strategy? Obtain all the data developed under the contract via a Contract Data Requirement List Only list the Defense Federal Acquisition Regulation Supplement (DFARS) clauses in the Intellectual Property Strategy Obtain the essential, proper and necessary data via a Contract Data Requirement List Only obtain computer software source code Question 8 of 10. How should technical data be delivered from the contractor to the Program Office? The Program Office will ask for the delivery of the technical data from the contractor based on the need for the technical data. The Program Office will not submit any Contract Data Requirements List (CDRLs). All technical data will be stored at the contractor’s facility and the Program Office will only have access to the technical data based on the contractor’s direction.
The technical data will be delivered based on the contractor’s costs to develop the technical data. The contractor will provide the Program Office the deliverable only when requested. The Program Office will submit Contract Data Requirements List (CDRLs) for all essential, proper and necessary technical data in the Request for Proposal and the subsequent contract. The CDRLs will list the address and the point of contact for the delivery of the technical data. Question 9 of 10. What action is required with the OEM to assure the Logistician can review and validate the accuracy of the Logistics Product Database (LPD)? Direct coordination for LPD through Integrated Product Team channels is the preferred strategy. No contract requirement is necessary. A contractual requirement should be developed to enable the delivery of a GEIA-STD-0007- compliant database, to include updates on an iterative basis. All of the answers are correct. The Logistics Product Database is not required to perform Supportability analyses because of increased capability in spreadsheets. Question 10 of 10. Select one positive impact with storing DoD’s technical data in a commercial Cloud Service Provider. There are zero risks with storing data in a Cloud Service Provider There is no cost associated with storing technical data with a Cloud Service Provider None of the answers are correct Cloud storage providers enable innovation for technical data storage
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help