clcl 010 test 3
docx
keyboard_arrow_up
School
Defense Acquisition University *
*We aren’t endorsed by this school
Course
CLCL004
Subject
Industrial Engineering
Date
Jan 9, 2024
Type
docx
Pages
3
Uploaded by eugene5316
Question 1 of 10.
What are three technical data items that go into a product Technical Data Package (TDP)
for a new Army tank entering production?
Computer software source code for the navigation system
Engineering 2D drawings of the engine
Parts list of the fuel pump
Packing details of an electric motor
Question 2 of 10.
The lube oil purifier for a DDG 51 Class Destroyer failed during production builders trials
due to an unreliable bearing.
Which three of the following IPS Elements in Page 3, Block 38, of the ECP Form are most
likely to be effected?
Product Support Management
Design Interface
Manpower & Personnel
Sustaining Engineering
Support Equipment
Supply Support
Other
Training & Training Support
Facilities & Structure
Maintenance Planning & Mgmt
Computer Resources
Packaging, Handling, Storage, and Transportation (PHS&T)
Technical Data
Question 3 of 10.
A radar subassembly is now obsolete, but the depot team found a replacement subassembly.
What two pieces of Logistic Product Data need to be developed or modified for the new
subassembly? Select two that apply.
Updated System Requirement Specifications
Technical manual
Supply support information
Engineering drawings
Question 4 of 10.
What is an example characterized by Cloud storage as, “a sudden spike in the number of
online users that needed to review digital engineering drawings?”
Resource Pooling
On-Demand Self Service
Rapid Elasticity
Broad Network Assess
Question 5 of 10.
What logistics product data would be requested by submitting a completed CDRL for a
new four ton folk lift to be delivered to the Army?
Test Reports
Interface Control Drawings
System Requirement Specification
Preservation and Packing Data
Question 6 of 10.
You are assigned to review the engineering drawing for the correct format. The drawing is
for a type 3D native model. What is your response about the drawing?
Drawing is almost correct since it is a blue print
Drawing is correct; a 3D native model
None of these responses is correct.
Not a 3D native model
Question 7 of 10.
You are assigned as lead logistician to lead a team and to develop an Intellectual Property
Strategy concept for a new weapon system. What would you state to the team in terms of
an IP data management strategy?
Obtain all the data developed under the contract via a Contract Data Requirement List
Only list the Defense Federal Acquisition Regulation Supplement (DFARS) clauses in the
Intellectual Property Strategy
Obtain the essential, proper and necessary data via a Contract Data Requirement List
Only obtain computer software source code
Question 8 of 10.
How should technical data be delivered from the contractor to the Program Office?
The Program Office will ask for the delivery of the technical data from the contractor based on
the need for the technical data. The Program Office will not submit any Contract Data
Requirements List (CDRLs).
All technical data will be stored at the contractor’s facility and the Program Office will only
have access to the technical data based on the contractor’s direction.
The technical data will be delivered based on the contractor’s costs to develop the technical data.
The contractor will provide the Program Office the deliverable only when requested.
The Program Office will submit Contract Data Requirements List (CDRLs) for all essential,
proper and necessary technical data in the Request for Proposal and the subsequent contract. The
CDRLs will list the address and the point of contact for the delivery of the technical data.
Question 9 of 10.
What action is required with the OEM to assure the Logistician can review and validate the
accuracy of the Logistics Product Database (LPD)?
Direct coordination for LPD through Integrated Product Team channels is the preferred strategy.
No contract requirement is necessary.
A contractual requirement should be developed to enable the delivery of a GEIA-STD-0007-
compliant database, to include updates on an iterative basis.
All of the answers are correct.
The Logistics Product Database is not required to perform Supportability analyses because of
increased capability in spreadsheets.
Question 10 of 10.
Select one positive impact with storing DoD’s technical data in a commercial Cloud Service
Provider.
There are zero risks with storing data in a Cloud Service Provider
There is no cost associated with storing technical data with a Cloud Service Provider
None of the answers are correct
Cloud storage providers enable innovation for technical data storage
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help