HW1-Fall23

docx

School

Dallas County Community College *

*We aren’t endorsed by this school

Course

4351

Subject

Industrial Engineering

Date

Dec 6, 2023

Type

docx

Pages

1

Uploaded by MegaResolveViper31

Report
IE 4351-5357 Homework 1 Due August 31, 2023 Read Chapters 1 and 2. Begin thinking about your project topic. 1. Identify your project team members. Recall this is due September 7. Remember that if you have less than 5 team members that I may additional members to bring your total up to 5. Also, teams are to be only undergraduate students or only graduate students but not a mix of both. 2. Superior testing is a company that manufactures testing equipment used to test asphalt and metal specimens. Superior has a 30,000 square foot facility and does fabrication work such as shearing, welding and machining in addition to assembly of their test devices. Thus, they receive some raw materials such as bar stock and sheet steel that they process in addition to electrical components and other parts that they assemble. They ship approximately 40 units per month, have a work force of about 75, and annual revenues of approximately $18 million. Given this brief background, list and discuss possible layout and material handling considerations that would be important for Superior to be considering. (30 pts) 3. During the COVID-19 Pandemic vaccination clinics were held at the Lubbock Civic Center for several months. If you were in charge of designing the layout and operational plans for these vaccination clinics what people would you want to have as members of your design team? Why? (30 pts) 4. Suppose you work at the Wesco distribution center in Dallas and you are the Industrial Engineer in charge of operations. You need to decide how many shelving unit storage locations to allocate to an electronic switchbox. The switchbox comes in a cardboard carton and you can fit 15 of these cartons onto one shelving unit. Currently shipments arrive following a Normal distribution with a mean of 155 cartons per month and a standard deviation of 11 cartons per month. Assume that the switchboxes arrive during the first week of the month and then are shipped out during the last three weeks of the month. a. How many shelving units do you need to allocate to switchboxes to be 97% certain that you can store all the switchboxes that arrive during one month? Comment on your answer. (10 pts) b. What is the probability that more than 160 cartons arrive during the first month? (10 pts) c. What is the probability that more than 160 cartons arrive in at least 8 of the next 12 months? (10 pts) d. What is the likelihood that more than 1920 switchboxes arrive over a 12 month period? (10 pts)
Discover more documents: Sign up today!
Unlock a world of knowledge! Explore tailored content for a richer learning experience. Here's what you'll get:
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help