3/6/24, 12:30 PM
Topic 5 Quick Check - Supplier Evaluation and Selection — OPS/330T: Strategic Operations and Logistics - 2023
https://app.myeducator.com/course/activity.lti/1773c/3117750143292858369/
1/4
Points: 15
Submission Score
15 / 15 (100.00%)
Submit Time
Feb 23 at 20:31
Grade Time
Feb 23 at 20:31
Graded on Feb 23 at 20:24
Submission #1:
Graded on Feb 23 at 20:31
Submission #2:
1
Monitoring inventory
Choosing the right supplier
Getting the lowest price
Checking deliveries for accuracy
2 / 2 (100.0%)
2
Routine
Critical
Leverage
Bottleneck
2 / 2 (100.0%)
3
Establish strong buyer-supplier relationships.
3/6/24, 12:30 PM
Topic 5 Quick Check - Supplier Evaluation and Selection — OPS/330T: Strategic Operations and Logistics - 2023
https://app.myeducator.com/course/activity.lti/1773c/3117750143292858369/
2/4
Require suppliers to deliver high-quality products in advance.
Require suppliers to deliver products simultaneously.
Establish buyer dominance.
2 / 2 (100.0%)
4
Relationship
Location
Buying from a friend
eCommerce
2 / 2 (100.0%)
5
Lower prices and better service
Access to a wider bundle of products and emerging technologies
Invest more resources in supplier selection and management
Higher value and more resources
2 / 2 (100.0%)
6
Reverse psychology
Negotiation
Low-ball bidding
Blackmail
3/6/24, 12:30 PM
Topic 5 Quick Check - Supplier Evaluation and Selection — OPS/330T: Strategic Operations and Logistics - 2023
https://app.myeducator.com/course/activity.lti/1773c/3117750143292858369/
3/4
1 / 1 (100.0%)
7
Performance on potential orders
Supplier preferences
The same metrics you used to select the supplier
How nice the supplier is
1 / 1 (100.0%)
8
Multi-criteria analysis is complex and requires intense data crunching.
Multi-criteria analysis enables you to qualify quantitative issues.
Multi-criteria analysis is widely applicable; that is, you can use it whenever
decision-making requires comparing options.
Multi-criteria analysis erases the need to do your homework in order to make a
good decision.
1 / 1 (100.0%)
9
Nuisance
Exploitable
Development
Core
1 / 1 (100.0%)
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
3/6/24, 12:30 PM
Topic 5 Quick Check - Supplier Evaluation and Selection — OPS/330T: Strategic Operations and Logistics - 2023
https://app.myeducator.com/course/activity.lti/1773c/3117750143292858369/
4/4
Copyright © 2024 MyEducator. All rights reserved.
10
Increase the amount you spend
Increase the amount of service you ask for
Increase the demands on the supplier
Call the supplier more frequently to talk
1 / 1 (100.0%)
Started on Mar 06 at 10:30
Submission #3:
Need Help?
Related Documents
Related Questions
The system having ±0.5% of F.S.D if the full scale deflection is 50 units, then accuracy is _____
a. ±0.25
b. ±1
c. ±0
d. ±0.5
arrow_forward
Analyse several voltage and current situations in different loading scenarios in a simplified radial (transformer to consumption) medium-voltage power system example. There are only 2 nodes in the 35 kV line – node 0 from the 110/35 kV and node 1 with one consumer. The physical characteristics of the line and the loading scenarios are individualized for each student – please see the attached file Excel “WM9P3 Task1 data” for your particular data set.
Briefly reflect on the complexity of the calculations for known input or output voltage, as well as for fixed or voltage-dependent consumption in this simple power system model.
Analyse and discuss the sensitivity of the voltage drop [in % of amplitude and the degrees of phase] with respect to the current level [in %] and to the power factor.
arrow_forward
AA
Health and Safety
Mr Ali Lilo, AL4510222L
Time remaining: 53 Quick
Select
QuestiBintaseconds
three of the following
items of information are
required when completing
a RIDDOR form?
1 Date & time of incident
2 Type of accident
3 Organisation details.
4 Employer public liability
insurance
a) 3,2,4
b) 1,4,3
c) 4,2,1
d) 2,3,1
Prev Next
actclass.co.uk
Questi
22
Questi
23
Questi
24
Questi
25
Questi
26
Questi
27
Questi
Submit Answers
arrow_forward
Question 3 and 4
arrow_forward
ELECTRIC MACHINERY
do the (iii, iv v)
arrow_forward
(c) Draw a circuit diagram to represent a TN-C-S earthing system and briefly explain its advantages and disadvantages.
(d) Briefly explain how to estimate the height of air termination of a lightning protection system network using the rolling sphere method and protection angle method.
(e) Briefly explain what is meant by Ground Potential Rise (GPR) and explain why an animal like cow would not be adequately protected against GPR.
Note : answer all or else dnt attempt the question
arrow_forward
KINDLY ANSWER THESE THREE QUESTIONS. THANK YOU AND PLEASE PROVIDE EXPLANATION
arrow_forward
The maximum electrical trade size of intermediate conduit is
a.) 150 mm b.) 125 mm c.) 200 mm d.) 100 mm
arrow_forward
Voltages are represented by:
e, = 20sinwt
e2 = 30sin (wt
ez = 40cos (wt +")
e4 = -15sin wt
es = -25cos (wt – ")
Find the resultant instantaneous voltage using:
(a)
(b)
(c)
trigonometric identities
component method
complex method
arrow_forward
27).
2 In the northeastern United States, in which direction does the needle of a magnetic compass point?
OEast of geographic north
O South of geographic north
O North of geographic north
West of geographic north
28)
Inter-row spacing for a tilted rack array is determined by which factors?
O Slope and voltage of modules
O Sun angle and tilt of modules
O Sun angle and voltage of modules
O Rack manufacturer specifications
24)
Which type of PV array mounting system is MOST common for a residential application with a sloped, south-facing roof?
O Rack mount
O Pole mount
O Ballasted mount
O Standoff mount
30)
A specification requires the PV array for a stand-alone PV system to be sized to produce 1.25 times the average daily system load of 80 Ah when the
irradiation recelved on the array is 4 peak sun hours. If the selected PV module has STC-rated maximum power current (Imp) of 5 A, how many parallel-
connected strings of modules are required?
5
31 Which silicon solar cell manufacturing…
arrow_forward
15.a. You're installing a feeder in a hospital that will terminate in five branch circuits in patient care areas. Tomake the feeder legal for this purpose in this area, you mustA. use enhanced bonding practices on the feeder's raceway.B. bond the neutral to a grounding electrode at both ends of the feeder.C. run a bonded and an isolated EGC.D. run two wire conductor EGCs.15.b. An electrical system that's not grounded and is between 120 and 1000 volts must include the use ofA. equipotential barriers.B. ground detectors.C. ground isolators.D. arc suppression.
arrow_forward
-
arrow_forward
What is the correct repair for faulted or damaged SRS component pigtails?
O Component replacement
O Terminal repair kit
O Crimp, solder, heat shrink
O Harness replaceme
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you

EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT
Related Questions
- The system having ±0.5% of F.S.D if the full scale deflection is 50 units, then accuracy is _____ a. ±0.25 b. ±1 c. ±0 d. ±0.5arrow_forwardAnalyse several voltage and current situations in different loading scenarios in a simplified radial (transformer to consumption) medium-voltage power system example. There are only 2 nodes in the 35 kV line – node 0 from the 110/35 kV and node 1 with one consumer. The physical characteristics of the line and the loading scenarios are individualized for each student – please see the attached file Excel “WM9P3 Task1 data” for your particular data set. Briefly reflect on the complexity of the calculations for known input or output voltage, as well as for fixed or voltage-dependent consumption in this simple power system model. Analyse and discuss the sensitivity of the voltage drop [in % of amplitude and the degrees of phase] with respect to the current level [in %] and to the power factor.arrow_forwardAA Health and Safety Mr Ali Lilo, AL4510222L Time remaining: 53 Quick Select QuestiBintaseconds three of the following items of information are required when completing a RIDDOR form? 1 Date & time of incident 2 Type of accident 3 Organisation details. 4 Employer public liability insurance a) 3,2,4 b) 1,4,3 c) 4,2,1 d) 2,3,1 Prev Next actclass.co.uk Questi 22 Questi 23 Questi 24 Questi 25 Questi 26 Questi 27 Questi Submit Answersarrow_forward
- Question 3 and 4arrow_forwardELECTRIC MACHINERY do the (iii, iv v)arrow_forward(c) Draw a circuit diagram to represent a TN-C-S earthing system and briefly explain its advantages and disadvantages. (d) Briefly explain how to estimate the height of air termination of a lightning protection system network using the rolling sphere method and protection angle method. (e) Briefly explain what is meant by Ground Potential Rise (GPR) and explain why an animal like cow would not be adequately protected against GPR. Note : answer all or else dnt attempt the questionarrow_forward
- KINDLY ANSWER THESE THREE QUESTIONS. THANK YOU AND PLEASE PROVIDE EXPLANATIONarrow_forwardThe maximum electrical trade size of intermediate conduit is a.) 150 mm b.) 125 mm c.) 200 mm d.) 100 mmarrow_forwardVoltages are represented by: e, = 20sinwt e2 = 30sin (wt ez = 40cos (wt +") e4 = -15sin wt es = -25cos (wt – ") Find the resultant instantaneous voltage using: (a) (b) (c) trigonometric identities component method complex methodarrow_forward
- 27). 2 In the northeastern United States, in which direction does the needle of a magnetic compass point? OEast of geographic north O South of geographic north O North of geographic north West of geographic north 28) Inter-row spacing for a tilted rack array is determined by which factors? O Slope and voltage of modules O Sun angle and tilt of modules O Sun angle and voltage of modules O Rack manufacturer specifications 24) Which type of PV array mounting system is MOST common for a residential application with a sloped, south-facing roof? O Rack mount O Pole mount O Ballasted mount O Standoff mount 30) A specification requires the PV array for a stand-alone PV system to be sized to produce 1.25 times the average daily system load of 80 Ah when the irradiation recelved on the array is 4 peak sun hours. If the selected PV module has STC-rated maximum power current (Imp) of 5 A, how many parallel- connected strings of modules are required? 5 31 Which silicon solar cell manufacturing…arrow_forward15.a. You're installing a feeder in a hospital that will terminate in five branch circuits in patient care areas. Tomake the feeder legal for this purpose in this area, you mustA. use enhanced bonding practices on the feeder's raceway.B. bond the neutral to a grounding electrode at both ends of the feeder.C. run a bonded and an isolated EGC.D. run two wire conductor EGCs.15.b. An electrical system that's not grounded and is between 120 and 1000 volts must include the use ofA. equipotential barriers.B. ground detectors.C. ground isolators.D. arc suppression.arrow_forward-arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- EBK ELECTRICAL WIRING RESIDENTIALElectrical EngineeringISBN:9781337516549Author:SimmonsPublisher:CENGAGE LEARNING - CONSIGNMENT

EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT