SERVICE BULLETIN
NOTICE:
The Type of Change and Recommended Compliance specified reflects Solar’s best judgment regarding the
Service Bulletin. All questions should be directed to your Solar Field Service Representative. Solar, Saturn,
Centaur, Taurus, Mercury, Mars, Titan, SoLoNOx, and Turbotronic are trademarks of Solar Turbines Incorporated.
Cat and Caterpillar are trademarks of Caterpillar Inc. Specifications subject to change without notice.
NUMBER:
5.13.1/100
ISSUED:
September 2000
REVISED:
PRODUCT:
All
MODEL(S):
All
Specifics:
Applies to all Turbotronic units with 24 VDC display computers
supplied directly from a 24 VDC distribution breaker.
SUBJECT: VOLTAGE SPIKE SUPPRESSION
Type of Change:
Product Enhancement
Recommended
Compliance:
Information
Purpose:
To inform customers of enhancements providing additional protection of 24 VDC control equip-
ment subject to high voltage spikes on the 24 VDC supply.
GENERAL INFORMATION:
Since 1996 Solar has supplied display computers in control consoles powered directly from the
24 VDC battery system (18-32VDC). Some applications in the field have experienced failures of
the power supply section of those computers. Analysis of the failed computers showed that the
power supply had been subjected to spike voltages in excess of 40 volts. Damaging ground spikes
have been found to occur when generating the arc on nearby welding equipment. Damaging signal
spikes have been found to occur when low performance battery chargers go into high charge. To
help protect against these spikes EMI filters conditioning the 24 VDC supply entering the consoles
were upgraded to EMI/surge/spike filters. All new production control systems are now configure
with the upgraded filter.
SERVICE BULLETIN
Page 1 of 2
NUMBER: 5.13.1/100
ACTION REQUIRED:
If you are having reliability problems on your display computer, verify that 24 VDC supply to the
display computer passes through an upgraded filter. If you do not have a configuration as described
in the recommended arrangement for surge/spike filters section, contact your local Solar Turbines
District Office for assistance.
Recommended Arrangement EMI/Surge/Spike Filters:
1.
24 VDC Battery Charger Systems:
a.
24 VDC from the battery charger splits and passes through one of two main circuit
breakers in the control console. After the main breakers the 24 VDC supply passes
through an EMI/surge/spike filter. Following the filters are separate distribution
breakers to each piece of equipment.
b.
Approved EMI/surge/spike filters:
I.
Solar part number 1022716-1. This is a 32 amp CSA class 1 div 2 filter
generally used in normal control systems driving the display PC.
II.
Solar part number 1022716-2. This is a 25 amp CSA class 1 div 2 filter
generally used for the backup shutdown system or in normal control system
on-skid boxes.
2.
120 VDC Battery Charger Systems:
a.
120 VDC power is converted to control 24VDC power through an integrated power
supply and EMI/surge/spike filter. The outputs of that power supply/filter then pass
on to the distribution breakers for the normal control system and backup shutdown
system equipment.
b.
Approved device:
I.
Solar part number 1021207-1. This is a double slot, 1200 watt, 50 amp, CSA
class 1 div 2 (pending) power supply with full EMI/surge/spike filters.
Page 2 of 2
SERVICE BULLETIN
NUMBER: 5.13.1/100
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
7.a. Photoelectric eye alignment is typically a PM task for a(n)A. electrician.B. lubricator.C. machine operator.D. mechanic.7.b. Mean time before failure describesA. how long it will take between failures at your plant.B. how long before one component in a group will fail.C. how a failure will occur on a component that’s inside a machine.D. the amount of time a component will last when it’s heavily loaded.7.c. Under an ISO 9000 program, which one of the following employees is responsible for checkingcompleted work to make sure it has been performed to company specifications?A. The maintenance general managerB. The PM program administratorC. A shop foremanD. A maintenance technician
arrow_forward
Suppose that you were an engineer planning a new electric co-generation facility for a plant with excess process steam. You have a choice of either two 10 MW turbine-generators or a single 20 MW turbine generator. What would be the advantages and disadvantages of each choice?
(Note: Ans with detail hand writing.) step by step and headings
arrow_forward
Question No.13: Explain briefly the methods available to improve thermal efficiency of gas turbine plant.
arrow_forward
With schematic diagram, explain the Wind Power Plant.
arrow_forward
4. Explain the relationship between back emf E, terminal voltage V and coil voltage
drop IR in DC motor and generator respectively.
i. Describe how the field strength affect the performance of DC motor and generator.
ii. Explain how an external resister changes the DC motor and generator
performance.
arrow_forward
The system having ±0.5% of F.S.D if the full scale deflection is 50 units, then accuracy is _____
a. ±0.25
b. ±1
c. ±0
d. ±0.5
arrow_forward
What is the significance of power system stability in electrical engineering?
arrow_forward
D.a. Which one of the following PM programs is usually the largest for a typical manufacturing facility?A. LubricationB. ElectronicC. ElectricalD. MechanicalD.b. The true purpose of uptime inspection PM is toA. keep the PM staff working during low maintenance periods.B. locate problems that occur on a random basis.C. supplement the lubrication PMs in looking for dry bearings and other lubrication problems.D. look for common recurring problems in equipment.
D.c. When machines fail shortly after they’ve been built and installed, the failures are termedA. singularity failures.B. independent component failures.C. short-term failures.D. infant mortality failures.
arrow_forward
Explain the concept of motherboard power phases and their impact on system stability and overclocking.
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you

Related Questions
- 7.a. Photoelectric eye alignment is typically a PM task for a(n)A. electrician.B. lubricator.C. machine operator.D. mechanic.7.b. Mean time before failure describesA. how long it will take between failures at your plant.B. how long before one component in a group will fail.C. how a failure will occur on a component that’s inside a machine.D. the amount of time a component will last when it’s heavily loaded.7.c. Under an ISO 9000 program, which one of the following employees is responsible for checkingcompleted work to make sure it has been performed to company specifications?A. The maintenance general managerB. The PM program administratorC. A shop foremanD. A maintenance technicianarrow_forwardSuppose that you were an engineer planning a new electric co-generation facility for a plant with excess process steam. You have a choice of either two 10 MW turbine-generators or a single 20 MW turbine generator. What would be the advantages and disadvantages of each choice? (Note: Ans with detail hand writing.) step by step and headingsarrow_forwardQuestion No.13: Explain briefly the methods available to improve thermal efficiency of gas turbine plant.arrow_forward
- With schematic diagram, explain the Wind Power Plant.arrow_forward4. Explain the relationship between back emf E, terminal voltage V and coil voltage drop IR in DC motor and generator respectively. i. Describe how the field strength affect the performance of DC motor and generator. ii. Explain how an external resister changes the DC motor and generator performance.arrow_forwardThe system having ±0.5% of F.S.D if the full scale deflection is 50 units, then accuracy is _____ a. ±0.25 b. ±1 c. ±0 d. ±0.5arrow_forward
- What is the significance of power system stability in electrical engineering?arrow_forwardD.a. Which one of the following PM programs is usually the largest for a typical manufacturing facility?A. LubricationB. ElectronicC. ElectricalD. MechanicalD.b. The true purpose of uptime inspection PM is toA. keep the PM staff working during low maintenance periods.B. locate problems that occur on a random basis.C. supplement the lubrication PMs in looking for dry bearings and other lubrication problems.D. look for common recurring problems in equipment. D.c. When machines fail shortly after they’ve been built and installed, the failures are termedA. singularity failures.B. independent component failures.C. short-term failures.D. infant mortality failures.arrow_forwardExplain the concept of motherboard power phases and their impact on system stability and overclocking.arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you