1.1 What are site plans? Site plans are the plans which show all site related information, levels, service locations, easements, adjacent properties, setbacks boundaries, site access, building footprint, fence lines, adjacent roads, trees, existing services, proposed demolitions and removals as well as various other items related to the overall site itself. Information contained on a site or block plan would be: Site plans are often to a scale of 200:1 as to have any other scale than this would mean that if drawings are printed in standard sizes they may be illegible. This is not to say that site plans can bedone in other scales, it’s just more common to use 200:1 scale. 1.2 Identify 6 items that would appear on a site plan. 1 Boundary dimensions of the block 2 Distance from street to boundary 3 Set-back distance from front boundary to building line 4 Distance from side boundary to building 5 Contour lines and their height 6 Position of paths and driveways
Assessment Workbook CPCCOM2001 Read and interpret plans and specifications V1 © ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. CPC30620 Certificate III in Painting and Decorating Page 2 of 51 1.3 Identify 6 items that would appear on a floor plan. 1 Internal layout of the building 2 Room sizes 3 Wall thicknesses 4 Floor coverings 5 Major fixtures such as toilets, dishwashers, washing machine, doorswings 6 Floor heights i.e. FFL (finished floor levels) 1.4 Describe an elevation view on a set of drawings for a building. Elevations provide information relating to vertical measurements and external finishes. Each view isidentified according to the direction it faces, in relation to the points of the compass, based on the north point shown on the site plan. 1.5 What are 3 key aspects which can be found on a set of plans? 1 Floor plans denote the internal layout of the building, it can often include room sizes, wall thicknesses, floor coverings, major fixtures such as toilets, dishwashers, washing machine, door swings as well asfloor heights i.e. FFL (finished floor levels). 2 Site plans show all site related information, levels, service locations, easements, adjacent properties, setbacks boundaries, site access, building footprint, fence lines, adjacent roads, trees, existing services,proposed demolitions and removals as well as various other items related to the overall site itself. 3 Elevations provide information relating to vertical measurements andexternal finishes. Each view is identified according to the direction it faces, in relation to the points of the compass, based on the north point shown on the site plan.
Assessment Workbook CPCCOM2001 Read and interpret plans and specifications V1 © ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. CPC30620 Certificate III in Painting and Decorating Page 3 of 51 1.6 What scales are the following plans typically drawn to? Complete the table. Site Plan Site plans are often to a scale of 200:1 as to have any other scale than this would mean that if drawings are printed in standard sizes they may be illegible. This is not to say that site plans can bedone in other scales, it’s just more common to use 200:1 scale. Elevations Floor plans are oftendrafted in a scale of 1:100 this ensures that a clear picture of the overall dwelling is had. Detail drawings Detail drawings often show things or items that cannot be shown clearly on either the floor plan orelevations due to the scale of said drawings (often 100:1) Detailed drawings can be used to show in other scales (close-up) of the smaller or finer details ofareas to be constructed (often 20:1, 10:1, 5:1, 2:1, 1:1).
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Assessment Workbook CPCCOM2001 Read and interpret plans and specifications V1 © ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. CPC30620 Certificate III in Painting and Decorating Page 2 of 51 1.7 Before entering the construction site shown below, what PPE must be worn? Head protection e.g. helmets, caps, hoods, hats Foot protection e.g. shoes/boots Other protection e.g. protective clothing for extremely hot or cold environments 1.8 Explain where you would locate information relating to your specific job plans and environmental laws and regulations. They can be found in documents such as job plans, job specifications and environmental plans and specifications for the jobsite 1.9 How can you ensure you have the most current up to date version of the plans for the site? When checking to verify the latest amendments and specifications to the drawing are current you should always refer to the title panel of the notes, plans or drawings. Amendment registers keep allow for records to be kept which show when changes have been made to the specifications or plans. Always check with a supervisor or the owner as to the currency of plans 10 What would you do if you noticed something that was not to specifications? Who would you contact? Explain your workplace process in detail. Consult the architect or engineer if the variation compromises safety or integrity. If necessary, revised plans would be created specifying the precise corrective actions. To ensure that the problem is recognised and resolved properly, team members must communicate effectively throughout the process. 11 Jeff Allen is the site foreman. You overhear him at 10.30 am after the site toolbox meeting talking to another contractor about amendments that have been made to the site plans since yesterday. The storm water pipes have had changes to the end location point. How should this have been communicated to all staff? How should you verify this information? The changes to the plans should have been discussed at the site toolbox meeting at 0600 on the day of the order of the workload; the plans should be updated immediately to take account of any changes to the appropriate staff. You should confirm this directly with the Site Foreman Jeff Allen, and suggest that he recall all staff that this change may impact into the site office for an emergency meeting about the plans. 12 Abbreviations are frequently used on plans and specifications, including measurement abbreviations and commonly used construction symbols. List two commonly used workplace symbols and two workplace used abbreviations. Two workplace used abbreviations are – cft. Ceramic floor tiles selected by client CJ. Control Joint DP. Downpipe FL. Floor level
Assessment Workbook CPCCOM2001 Read and interpret plans and specifications V1 © ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. CPC30620 Certificate III in Painting and Decorating Page 3 of 51 SD. Sliding Door 13How can you confirm the required materials and/or quantities for the site plan? When confirmed how and where are they recorded? Examine the site plan and any supporting architectural drawings thoroughly. List all parts, buildings, and elements that demand particular supplies in a certain amount. Cross-reference the site plan with the project specifications by referring to the specifications. Details on the kind, calibre, size, and quantity of materials needed for each aspect of the project are provided in specifications. After the necessary materials and quantities are established, this data should be recorded in a planned manner. 14How can you confirm the orientation of the plan against the site operations? Orientate the site plan with the site Given that true north refers to the direction to the geographic North Pole, and not the magnetic north point (which always changes), you cannot use a compass to identify true north. Compasses can only be used to identify magnetic north. 15What are specifications? Explain their purpose. A specification is a written document that forms part of the description of the building to be constructed. It supplements the information on the drawings and, like the drawings, is a legal partof the contract between the client and the builder. Purpose of specifications are as follows:- Specifications are commonly used to communicate the following: i. Fixtures and fittings to be used, where things like dimensions, colour or model number areimportant ii. To provide instructions to the builder or tradespeople for how something is to be done. iii. To provide instructions to the builder about things that may not be part of the finished building but that nevertheless need to happen during the project 16Provide 5 examples of ancillary works. Living Room Pergola Garage Storage room Patio 17 Calculate the perimeter of the bathroom (not including the width of the wall studs). 9320 mm
Assessment Workbook CPCCOM2001 Read and interpret plans and specifications V1 © ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. CPC30620 Certificate III in Painting and Decorating Page 2 of 51 Part 1: Abbreviations Write the meaning of the common abbreviations below. Abbreviation Meaning BV Brick veneer DPC / DPM Damp Proof Course / Damp Proof Membrane FFL Finished floor levels DH Downhill FA Floor Area CF Cavity Fill BAL Bushfire Attack Level SS Site Supervisor Write the abbreviation for each of terms below. Abbreviation Meaning ENS Ensuite COL Column FW Floor waste BHO Bulkhead over FCL Finished ceiling level FC Fibre cement (sheet) TYP Typical
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Assessment Workbook CPCCOM2001 Read and interpret plans and specifications V1 © ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. CPC30620 Certificate III in Painting and Decorating Page 3 of 51 RL Reduced level Part 2: Symbols Write the meaning of each symbol below. Symbol Meaning Window Window and door references Hotplates Special area reference Horizontal sliding window with fixed sash Stairs Elevation reference
Assessment Workbook CPCCOM2001 Read and interpret plans and specifications V1 © ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. CPC30620 Certificate III in Painting and Decorating Page 2 of 51 Vanity with basin
Assessment Workbook CPCCOM2001 Read and interpret plans and specifications V1 © ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. CPC30620 Certificate III in Painting and Decorating Page 3 of 51 Draw the following symbols. Meaning Symbol Job datum level Compass Bathtub Single-swing door (90 degrees) Exposed sliding door Recessed object
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Assessment Workbook CPCCOM2001 Read and interpret plans and specifications V1 © ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. CPC30620 Certificate III in Painting and Decorating Page 2 of 51 Part 3: Project plans Refer to the set of project plans provided, to complete the table below. Who is the builder? Derbyshire (98 Pakington Street, Geelong West, Vic., 3218) What is the project number? 14-66 How many drawings are in the set? 22 Drawings What date were the plans drawn? 15/12/2015 What revisions were made to the floor plan? A (W 11 Position Moved) A (W 1 Width Revised) W2/ 2A Colour Revised W2 & W2A Hidden Internally What is the drawing title of drawing number A06? Electrical Plan On what street is the site? Site is on Pakington Street What is the scale of the site plan? 1:200 @ A3 What is the Finished Floor Level of the garage? GARAGE ( Finished Floor Level) FFL is 100.25 CONCRETE
Assessment Workbook CPCCOM2001 Read and interpret plans and specifications V1 © ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. CPC30620 Certificate III in Painting and Decorating Page 3 of 51 What is the Finished Floor Level of the proposed residence? P ROPOSED NEW RESIDENCE FFL is 100.4 What is the depth of the building block? Depth of Building block is 500 mm. What is the width of the building block? Width of building block is 33000 mm. Where is the easement located? Easement is located in Proposed New Residence What is the driveway finish? Concrete Driveway finishing is used. What is the area of the driveway? Area of the Driveway is 43m ² . How many bedrooms are there? 03 Bedrooms What are the dimensions of ‘Bed 3’? 3590 mm * 4260 mm What size (width × depth) is the WIR in the main bedroom? Width 899 mm Depth 2098 mm How wide is the kitchen window? Width of Kitchen Window is 1856 mm.
Assessment Workbook CPCCOM2001 Read and interpret plans and specifications V1 © ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. CPC30620 Certificate III in Painting and Decorating Page 2 of 51 What are the dimensions of the garage door? Height 2340 mm Width 1320 mm Where is the hot water service located? Hot Water Service is located in Section 2 beside bath. How many downpipes are there? 03 Downpipes What is the floor covering in the living room? Floor Covering in the living room is 5835mm*4230mm= 24688050 mm ² What does the red bubble mean? Revision made on Master Bed Window What is the pitch of the roof in the ‘South Elevation’ drawing? Pitch of the roof in South Elevation Drawing is 1:100 What type of window does the bathroom have? East oriented POWDERCOAT ALUMINIUM SINGLE GLAZED DBL. HUNG WHITE TRANSLUCENT Where are the solar panels located? Solar panels are located on the roof with fall 10 degree. What type of lighting is used to in the garage? Single GPO Type of Lighting is used with GARAGE 2.9 W/M2 (112W/38.304M 2
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
communicated to the public or adapted without permission. Page 4 of 51 Where is the Foxtel point? Foxtel point is in the Living Room How many flood lights with sensors are there? 02 Floof Lights with sensors are there. How many smoke detectors are there? 02 Smoke Detectors How many ceiling exhaust fans are there? 02 Ceiling Exhaust fans Where is the motion sensor located? Motion Sensor is located in Garrage. Smoke alarms are to be installed in accordance with which Australian Standard? Smoke Alarms are to be installed in accordance with with Australian Standard AS 3786:2014. What is the minimum and maximum tolerance of stair risers? STAIR REQUIREMENTS: RISERS 190mm MAXIMUM - 115mm MINIMUM.
communicated to the public or adapted without permission. Page 21 of 51 13Ho w you confirm the required materials
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
© ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. Page 22 of 51
communicated to the public or adapted without permission. Page 23 of 51
© ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. Page 25 of 51
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
© ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. Page 26 of 51 Part 2: Symbols Write the meaning of each symbol below. Symbol Meaning Window Window and door references Hotplates Special area reference Horizontal sliding window with fixed sash Stairs Elevation reference Vanity with basin
© ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. Page 27 of 51 Draw the following symbols. Meaning Symbol Job datum level Compass Bathtub Single-swing door (90 degrees) Exposed sliding door Recessed object
© ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. Page 28 of 51 Part 3: Project plans Refer to the set of project plans provided, to complete the table below. Who is the builder? Derbyshire (98 Pakington Street, Geelong West, Vic., 3218) What is the project number? 14-66 How many drawings are in the set? 22 Drawings What date were the plans drawn? 15/12/2015 What revisions were made to the floor plan? A (W 11 Position Moved) A (W 1 Width Revised) W2/ 2A Colour Revised W2 & W2A Hidden Internally What is the drawing title of drawing number A06? Electrical Plan On what street is the site? Site is on Pakington Street What is the scale of the site plan? 1:200 @ A3 What is the Finished Floor Level of the garage? GARAGE ( Finished Floor Level) FFL is 100.25 CONCRETE
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
© ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. Page 29 of 51 What is the Finished Floor Level of the proposed residence? P ROPOSED NEW RESIDENCE FFL is 100.4 What is the depth of the building block? Depth of Building block is 500 mm. What is the width of the building block? Width of building block is 33000 mm. Where is the easement located? Easement is located in Proposed New Residence What is the driveway finish? Concrete Driveway finishing is used. What is the area of the driveway? Area of the Driveway is 43m ² . How many bedrooms are there? 03 Bedrooms What are the dimensions of ‘Bed 3’? 3590 mm * 4260 mm What size (width × depth) is the WIR in the main bedroom? Width 899 mm Depth 2098 mm How wide is the kitchen window? Width of Kitchen Window is 1856 mm.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
© ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. Page 30 of 51 What are the dimensions of the garage door? Height 2340 mm Width 1320 mm Where is the hot water service located? Hot Water Service is located in Section 2 beside bath. How many downpipes are there? 03 Downpipes What is the floor covering in the living room? Floor Covering in the living room is 5835mm*4230mm= 24688050 mm ² What does the red bubble mean? Master Bed Window What is the pitch of the roof in the ‘South Elevation’ drawing? Pitch of the roof in South Elevation Drawing is 1:100 What type of window does the bathroom have? East oriented POWDERCOAT ALUMINIUM SINGLE GLAZED DBL. HUNG WHITE TRANSLUCENT Where are the solar panels located? Solar panels are located on the roof with fall 10 degree. What type of lighting is used to in the garage? Single GPO Type of Lighting is used with GARAGE 2.9 W/M2 (112W/38.304M 2
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
© ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. Page 31 of 51 Where is the Foxtel point? Foxtel point is in the Living Room How many flood lights with sensors are there? 02 Floof Lights with sensors are there. How many smoke detectors are there? 02 Smoke Detectors How many ceiling exhaust fans are there? 02 Ceiling Exhaust fans Where is the motion sensor located? Motion Sensor is located in Garrage. Smoke alarms are to be installed in accordance with which Australian Standard? Smoke Alarms are to be installed in accordance with with Australian Standard AS 3786:2014. What is the minimum and maximum tolerance of stair risers? STAIR REQUIREMENTS: RISERS 190mm MAXIMUM - 115mm MINIMUM. What is the plasterboard thickness to wall and ceilings? 10mm
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
© ATAR Design. All rights reserved. No part of this work may be produced, published, communicated to the public or adapted without permission. Page 32 of 51 What is the height of the boundary fence? Fencing 1.8 high What is the height of the ceiling? 2400 mm Summarise the tiling specifications of the bathroom. • Tiling from builder’s selection to bathroom and WC. Skirting and floor • Tiled shower base. What are the floor covering specifications for all rooms in the house and the garage? • Tiles to kitchen, family, dining, meals, hallways and entry area from builder’s selection. • Balance of house to be quality carpet from builder’s selection with rubber underlay. • Garage floor to be broom concrete finish. What are the dimensions of the kitchen sink? 1050mm 1/.75 bowl stainless steel sink with one tap hole. What size are the tiles on the kitchen backsplash? 400mm tiling How long is the statutory structural warranty? Six-year