Take a process that you encounter on a daily basis, such as the lunch cafeteria or the journey from your home to school or work, and identify the bottlenecks that limit the throughput of this process.
Interpretation: The barriers that hinder the process that is carried out regularly, i.e., a repeated process.
Concept Introduction: A bottleneck is the neck of a bottle, which restricts the flow of the liquid out of the bottle. In the case of process management, it refers to the sub-process and/or the activity which restricts the flow.
Answer to Problem 1DQ
Taking the process of getting ready for office and reaching the office:
- It is seen that preparing and eating breakfast is the constraint most of the time.
- At other times, driving to office becomes the constraint (due to allocated reasons).
Explanation of Solution
The process of getting ready for office and reaching the office is made up of many sub-processes/activities which can be sketched as follows:
In such a process, there is no tangible output but there is only one OUTCOME, that of reaching the office in time. The percent of times, the operator reaches in time is a measure of the efficiency of this process.
The outcome of reaching late may coincide with a longer time spent on preparing breakfast or longer time spent in driving.
Want to see more full solutions like this?
Chapter 5 Solutions
Operations Management: Processes and Supply Chains (11th Edition)
Additional Business Textbook Solutions
Operations Management
Principles Of Operations Management
Operations and Supply Chain Management 9th edition
OPERATIONS MANAGEMENT IN THE SUPPLY CHAIN: DECISIONS & CASES (Mcgraw-hill Series Operations and Decision Sciences)
Loose-leaf for Operations Management (The Mcgraw-hill Series in Operations and Decision Sciences)
Business in Action (8th Edition)
- A manufacturer's average WIP inventory for Part #2934 is 755 parts. The workstation produces parts at the rate of 295 parts per day. Use the Excel template Little's Law to find the average time a part spends in this workstation. Round your answer to two decimal places. daysarrow_forwardWhilst considering the best service user outcomes, discuss how you may utilise the concept of resource planning to free-up enough resources for the expansion of the ICU.arrow_forward“How many dozen should I put in the proofer?” asked Elizabeth, the new baker at the Sands Cafeteria. Rami El‐Hussieny was the day shift operations manager, and, unfortunately, he did not know how to answer Elizabeth's question. What she wanted to know was simple enough: How many dozen rolls should be placed in the proofer in anticipation of the night's dinner business? The problem was that the frozen dinner roll dough used at the Sands Cafeteria needed to be proof for at least 2 hours prior to being baked for 15 minutes. If too many rolls were proofed, they would never be needed, but they would still have to be baked and made into bread dressing or even tossed out. If too few dozen were proofed and the night was busier than anticipated, they would run out of “Fresh Baked Rolls” (one of the restaurant's signature items), and Rami knew that the night manager would be really upset. It was a daily guess, and sometimes Rami missed the guess! He wondered if a prebaked roll with a shelf life…arrow_forward
- What a flow line for production or service?arrow_forwardDesign and document with a system flowchart a computer-based manufacturing process that possesses the information flow of the manual systems depicted in Figures 7-9 and 7-13. Assume that the manufacturing process is triggered by a monthly sales forecast, which is received periodically from the marketing department in digital form. Further assume that all functional areas (work centers, storekeeping, inventory control, etc.) employ terminals that are networked to a centralized data processing function. Your system design should minimize hard-copy documents.arrow_forwardProvide a detailed example of a successful continuity plan implementation in a real-world business scenario.arrow_forward
- As a new management trainee hired in logistics. suggest possible ways to reduce the Turn around time of High loaded trucks inside and outside of the manufacturing plant. What automation tools can be used to support the samearrow_forwardWilliams Performance Co. manufactures sports cars. After making a sale, the salesperson sends thecar to be detailed before the customer takes it home. Detailing the car takes 30 minutes at a cost of$15 per hour for direct labor and $5 per car for materials. If the company is open 5 days per week andsells an average of five cars per day, what is the average cost per 5-day week for detailing cars?arrow_forwardRead the scenario below and answer the question that follow:Act Right College is a private college situated in Durban. Currently, the registration process has been amanual one (paper-based) at the college. This seems problematic since it is a time-consuming process.Management has decided to acquire the services of a systems' analyst to provide information onimplementing a database structure simplify the registration process as well as provide a faster turnaround time to attend to student registration queries. Management at Act Right College are seekingyour services as a database designer to implement a database as a solution to their problems.Question:Management has requested a report highlighting the functions of the soon-to-be implemented databasemanagement system (DBMS). Report to management on any FIVE (5) functions of the DBMS.arrow_forward
- Create a flow diagram for a rubber dog toy. Include the raw materials extraction, production, processing, transportation, use, and waste management in the diagramarrow_forwardThe staff training center at a large regional hospital provides training sessions in CPR to all employees. Assume that the capacity of this training system was designed to be 1800 employees per year. Since the training center was first put in use, the program has become more complex, so that 1400 now represents the most employees that can be trained per year. In the past year, 1350 employees were trained. Calculate the efficiency and the utilization of this system. An executive conference center has the physical ability to handle 1,100 participants. However, conference management personnel believe that only 1,000 participants can be handled effectively for most events. The last event, although forecasted to have 1,000 participants, resulted in the attendance of only 950 participants. What are the utilization and efficiency of the conference facility? . A fleet repair facility has the capacity to repair 800 trucks per month. However, due to scheduled maintenance of their…arrow_forwardIn the context of system management, explain the concept of "capacity planning." How does effective capacity planning contribute to system reliability and performance optimization?arrow_forward