Question

Solve the quetionno.2 only in full details. 

Question No. 1
An excavation is proposed for a square arca near the bend of a river as shown in Fig. P4.8. It is expected
that the flow of water into the excavation will come through the silt layer. Pumping tests reveal an average
horizontal bydraulic conductivity of 5.2 x 10 cm/s in the silt layer. The excavation has to be kept dry.
Determine the flow (q) into the excavation.
River
Excavation
Plan
1.2
Slape
Excavation
Silt
21 m
Cross section a-a
8 m
Not to scale
Question No. 2
The highway embankment from Noscut to Windsor Forest, described in the sample practical situation, is 10
km long. The average cross section of the embankment is shown in Fig. P3.22a. The gradation curves for
the soils at the two borrow pits are shown in Fig. P3.22b. Pit 1 is located 5 km from the start of the
embankment while pit 2 is 3 km away. Estimated costs for various earthmoving operations are shown in the
table below. Compare the cost and check which option is cheaper?
Cost
Operation
Pit 1
Pit 2
Purchase and load borrow pit material at site, haul 2 km
$10/m3
$12/m3
round trip, and spread with 200 HP dozer
$0.50/m3
$102/m
$10/m
$0.55/m3
Extra mileage charge for each km
Compaction
$1.26
Miscellaneous
$0.85/m3
Transcribed Image Text:Question No. 1 An excavation is proposed for a square arca near the bend of a river as shown in Fig. P4.8. It is expected that the flow of water into the excavation will come through the silt layer. Pumping tests reveal an average horizontal bydraulic conductivity of 5.2 x 10 cm/s in the silt layer. The excavation has to be kept dry. Determine the flow (q) into the excavation. River Excavation Plan 1.2 Slape Excavation Silt 21 m Cross section a-a 8 m Not to scale Question No. 2 The highway embankment from Noscut to Windsor Forest, described in the sample practical situation, is 10 km long. The average cross section of the embankment is shown in Fig. P3.22a. The gradation curves for the soils at the two borrow pits are shown in Fig. P3.22b. Pit 1 is located 5 km from the start of the embankment while pit 2 is 3 km away. Estimated costs for various earthmoving operations are shown in the table below. Compare the cost and check which option is cheaper? Cost Operation Pit 1 Pit 2 Purchase and load borrow pit material at site, haul 2 km $10/m3 $12/m3 round trip, and spread with 200 HP dozer $0.50/m3 $102/m $10/m $0.55/m3 Extra mileage charge for each km Compaction $1.26 Miscellaneous $0.85/m3
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Millwork and cabinet technology
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning