During your first month as an employee at Engro. Industries (a large drill-bit manufacturer), you are asked to evaluate alternatives for producing a newly designed drill bit on a turning machine. Your boss’ memorandum to you has practically no information about what the alternatives are and what criteria should be used. The same task was posed to a previous employee who could not finish the analysis, but she has given you the following information: An old turning machine valued at $350,000 exists (in the warehouse) that can be modified for the new drill bit. The in-house technicians have given an estimate of $40,000 to modify this machine, and they assure you that they will have the machine ready before the projected start date (although they have never done any modifications of this type). It is hoped that the old turning machine will be able to meet production requirements at full capacity. An outside company, Descon Engg. Inc., made the machine seven years ago and can easily do the same modifications for $60,000. The cooling system used for this machine is not environmentally safe and would require some disposal costs. Descon Engg. Inc., has offered to build a new turning machine with more environmental safeguards and higher capacity for a price of $450,000. Descon Engg. Inc., has promised this machine before the startup date and is willing
During your first month as an employee at Engro. Industries (a large drill-bit manufacturer),
you are asked to evaluate alternatives for producing a newly designed drill bit on a turning
machine. Your boss’ memorandum to you has practically no information about what the
alternatives are and what criteria should be used. The same task was posed to a previous
employee who could not finish the analysis, but she has given you the following information:
An old turning machine valued at $350,000 exists (in the warehouse) that can be modified for
the new drill bit. The in-house technicians have given an estimate of $40,000 to modify this
machine, and they assure you that they will have the machine ready before the projected start
date (although they have never done any modifications of this type). It is hoped that the old
turning machine will be able to meet production requirements at full capacity. An outside
company, Descon Engg. Inc., made the machine seven years ago and can easily do the same
modifications for $60,000. The cooling system used for this machine is not environmentally
safe and would require some disposal costs. Descon Engg. Inc., has offered to build a new
turning machine with more environmental safeguards and higher capacity for a price of
$450,000. Descon Engg. Inc., has promised this machine before the startup date and is willing
to pay any late costs. Your company has $100,000 set aside for the start-up of the new product
line of drill bits. For this situation,
a. Define the problem.
b. List key assumptions.
c. List alternatives facing Engro Industries.
2 | P a g e
d. Select a criterion for evaluation of alternatives.
e. Introduce risk into this situation.
f. Discuss how nonmonetary considerations may impact the selection.
g. Describe how a post audit could be performed.