dam soil requires void ratio of 0.80. An earth 1 million cubic meters of In the vicinity of the identified compacted to a proposed dam, suitable materials. The cost purchasing the soil and the cost of excavation are the same for each borrow pit. The only cost difference is transportation cost. The table below provides the void ratio and the transportation cost pit. four borrow pits were as having for each borrow Borrow Pit Void Ratio Transportation Cost (Php/m') 1 1.80 35.00 0.90 50.00 3 1.50 37.50 4. 1.30 42.00 1. Compute the cost for borrow pit 2. 2. Compute the cost for borrow pit 4. 3. Which borrow pit would be the most economical?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
An
earth
dam
requires
1
million cubic meters
of soil
compacted to a void ratio of 0.80. In the vicinity of the
proposed dam,
suitable materials. The cost purchasing the soil and the cost
of excavation are the same for each borrow pit. The only cost
difference is transportation cost. The table below provides
the void ratio and
pit.
four borrow pits were identified as having
the transportation cost
for each borrow
Borrow Pit
Void Ratio
Transportation Cost (Php/m²)
1
1.80
35.00
2
0.90
50.00
3
1.50
37.50
4
1.30
42.00
1. Compute the cost for borrow pit 2.
2. Compute the cost for borrow pit 4.
3. Which borrow pit would be the most economical?
Transcribed Image Text:An earth dam requires 1 million cubic meters of soil compacted to a void ratio of 0.80. In the vicinity of the proposed dam, suitable materials. The cost purchasing the soil and the cost of excavation are the same for each borrow pit. The only cost difference is transportation cost. The table below provides the void ratio and pit. four borrow pits were identified as having the transportation cost for each borrow Borrow Pit Void Ratio Transportation Cost (Php/m²) 1 1.80 35.00 2 0.90 50.00 3 1.50 37.50 4 1.30 42.00 1. Compute the cost for borrow pit 2. 2. Compute the cost for borrow pit 4. 3. Which borrow pit would be the most economical?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 7 steps

Blurred answer
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning