(a) A low voltage transformer manufacturing line has a purchase order of 1700 piece. If the manufacturing line production rate is 22 piece per minute use dimensional analysis techniques to determine the time taken to produce the requested transformers to the nearest minute in hours and minutes. (b) Assume that the production time of a transformer can be given by the following formula: t = Gm³v-31² Where m is the mass of the transformer in kg, v is the velocity of the manufacturing line in m/s and l is the length of the production line in meters. Find the dimensions of G. (c) In b, if m = 220 grams, 1= 10.2 m, v=2.3 m/s and time is 30.1 ms. Find G?
(a) A low voltage transformer manufacturing line has a purchase order of 1700 piece. If the manufacturing line production rate is 22 piece per minute use dimensional analysis techniques to determine the time taken to produce the requested transformers to the nearest minute in hours and minutes. (b) Assume that the production time of a transformer can be given by the following formula: t = Gm³v-31² Where m is the mass of the transformer in kg, v is the velocity of the manufacturing line in m/s and l is the length of the production line in meters. Find the dimensions of G. (c) In b, if m = 220 grams, 1= 10.2 m, v=2.3 m/s and time is 30.1 ms. Find G?
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps