Assignment 1
pdf
keyboard_arrow_up
School
Lamar University *
*We aren’t endorsed by this school
Course
3300
Subject
Management
Date
Feb 20, 2024
Type
Pages
4
Uploaded by litzyg2004
Garcia | 1
Litzy Garcia
Mr. Howell
MGMT_3300
Febuary 1, 2024
BUSI 2300
Assignment 1
Dr. Kakoli Bandyopadhyay
Total Points: 25
Submit: A word document with answers (fill in the tables with data) and relevant
screenshots to the questions asked in pages 2-3 of the assignment.
Global Electronics is a multinational manufacturer and distributor of portable electronic devices,
such as cell phones, tablet computers, and game consoles. Global recently introduced its newest
product, the Hawk 5G smartphone. The product rollout has been a huge international success,
largely because the Hawk has a unique feature – it can automatically translate text messages
from other Hawk phones into any language the user wants. The Hawk has been rolled out on five
continents from distribution centers in Atlanta, Nigeria, Brazil, Japan, and Germany. The
smartphone is being manufactured at four different facilities in Phoenix, China, Mexico, and
Belgium.
Tommy Wong, the president and the CEO of Global Electronics, is pleased with the success of
the Hawk’s introduction, but is concerned that Global might not be optimizing the assignment of
production from the manufacturing sites to the distribution centers. Currently, his planners are
assigning production manually based on the distances between manufacturing and distribution.
He thinks that transportation costs from the part suppliers and the manufacturing costs at each
site are not being taken into account using the current method.
We will use the Tableau software to work on this assignment. Tableau is used to perform visual
analysis for spreadsheets and databases. We will connect to the spreadsheet Global manufacturer
given below (An excel file: Global Electronics Updated will be made available). Use the
Assignment 1 Data Tab.
The total operating cost of each manufacturing site is given below:
Manufacturing
Site
Direct
Labor Cost
per Unit
Direct
Material
Cost
Overhead
Cost per Unit
Air
Freight In
Total Operating Cost
Phoenix
$1.00
$19.00
$3.00
$2.28
$4,600,461.91
Garcia | 2
Shanghai
$0.40
$19.00
$1.00
$1.20
$5,661,890.92
Monterrey
$0.50
$19.00
$2.00
$2.46
$8,938,978.40
Brussels
$1.20
$19.00
$4.00
$2.31
$9,517,459.48
Things to do:
Using Tableau answer the following questions:
1.
A. Which manufacturing site (Phoenix/Shanghai/Monterrey/Brussels) incurs the
maximum
air freight in cost per unit of production?
(4 points)
Hint:
drag and drop manufacturing sites from dimensions to columns and drag and drop air
freight cost from the measures to rows.
Go to Label > Show Mark Labels.
Manufacturing Site
Maximum Air
Freight Cost
Monterrey
$2.460
B. Copy and Paste the relevant bar graph from Tableau here (2 points)
1.
A.Which manufacturing site (Phoenix/Shanghai/Monterrey/Brussels) incurs the
minimum direct labor cost
per unit of production?
(4 points)
Hint:
drag and drop manufacturing sites from dimensions to columns and drag and drop direct
labor cost from the measures to rows.
Go to Label > Show Mark Labels.
Garcia | 3
Manufacturing Site
Minimum Direct
Labor Cost
Shanghai
$0.4
B. Copy and Paste the relevant bar graph from Tableau here (2 points)
1.
A. Which manufacturing site (Phoenix/Shanghai/Monterrey/Brussels) incurs the
maximum
overhead cost per unit of production?
(4 points)
Hint:
drag and drop manufacturing sites from dimensions to columns and drag and drop
overhead cost from the measures to rows.
Go to Label > Show Mark Labels.
Manufacturing Site
Maximum Overhead
Cost
Brussels
$4
B. Copy and Paste the relevant bar graph from Tableau here (2 points)
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Garcia | 4
1.
A. Which manufacturing site (Phoenix/Shanghai/Monterrey/Brussels) incurs the
maximum
total operating cost per unit of production?
(5 points)
Hint:
drag and drop manufacturing sites from dimensions to columns and drag and drop total
operating cost from the measures to rows.
Go to Label > Show Mark Labels.
Manufacturing Site
Maximum Total
Operating Cost
Brussels
$9517459
B. Copy and Paste the relevant bar graph from Tableau here (2 points)
Related Documents
Recommended textbooks for you

Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,

Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,