Quiz: Closing Project Risk Due Mar 8 at 11:59pm Points 50 Questions 25 Time Limit 45 Minutes Instructions The quiz: Covers the Learn material from Module 8: Week 8. Contains 25 multiple-choice, true/false questions. Is limited to 45 minutes. Allows 1 attempt. Is worth 50 points. Submit this assignment by 11:59 p.m. (ET) on Friday of Module 8: Week 8. Attempt History Attempt Time Score LATEST Attempt 1 45 minutes 40 out of 50 Correct answers are hidden. Score for this quiz: 40 out of 50 Submitted Mar 1 at 7:27pm This attempt took 45 minutes. Question 1 2 / 2 pts Which of the following DQSs would be “an established workflow to allow for review and approval” during Program Evaluation Management? controlled organized consistent
legible Question 2 2 / 2 pts In the Plus/Minus/Delta review technique, what question is being asked for items such as issues that should be corrected or items that should be revised? What are minuses? What are deltas? What are plusses? What are deviations? Question 3 2 / 2 pts The Capability Maturity Model Integration (CMMI) process is defined by five maturity levels. Which level would be categorized by a focus on process improvement? Level 2: Managed Level 5: Optimizing Level 4: Quantitatively Managed Level 1: Initial Question 4 2 / 2 pts Due to the changing nature of Agile, PMI has not developed a certification for this project management approach. True False
Question 5 2 / 2 pts When using the Plus/Minus/Delta approach, it is best to include very detailed, descriptive narrative since storage of this material is digital. True False Question 6 2 / 2 pts Macroevaluation has proven less effective than microevaluation due to the need for specifics in project evaluation. True False Question 7 2 / 2 pts In which of the following industries was Agile born? construction healthcare IT financial Question 8 2 / 2 pts Which of the following is one of the twelve principles of the Agile Manifesto? Working software is the principal measure of progress
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Self-organizing teams both a and b neither a or b Question 9 2 / 2 pts Agile project management would be inappropriate in industries such as construction or hospitality. False Question 10 2 / 2 pts The Key Evaluation Checklist would include all of the following steps EXCEPT: Storage and dissemination Preliminaries Subevaluations Conclusions and implications Question 11 2 / 2 pts Program Evaluation Management (PEM) seeks to manage the determination of merit (quality), worth (value) or _____ in projects. connection (link to customer) applicability (ease of use) significance (importance) cost (budget)
Question 12 2 / 2 pts The term Agile refers to something being light, flexible, and lively. True False Question 13 0 / 2 pts Agile Retrospectives (ARs) need to be communicated at the right time, at the right place, and _____. to the right people in the right way both a and b neither a or b IncorrectQuestion 14 2 / 2 pts The purpose of evaluation reporting includes convey information, facilitate understanding, and trace deviation for responsibility. False IncorrectQuestion 15 2 / 2 pts Effective Knowledge Transfer will catalog all knowledge available in an organization. False Question 16
2 / 2 pts What is the best answer to the question “Who is ultimately responsible for KT?” front line workers are most responsible KT consultants it is up to the organization none of the above Question 17 2 / 2 pts From a philosophic perspective, Knowledge Transfer would include all of the following EXCEPT: KT is not needed for smaller business due to the resources required KT enables the adoption of insights KT may occur as a one-time event or can be a continuous process KT embraces principles of adult learning theory IncorrectQuestion 18 0 / 2 pts Collaborative Evaluation is a partnership approach to conducing LL that engages _____ in the evaluation process. the project team shareholders upper management stakeholders Question 19 2 / 2 pts
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
According to Layton, Agile projects are built on the following principles EXCEPT: frequent interaction transparency predictability adaption Question 20 2 / 2 pts A chart that illustrates the start and finish dates, dependencies, and key elements is called a _____ chart. WBS Gantt Pert PMND Question 21 2 / 2 pts The question of how knowledge is transferred includes items such as ____. people location repositories all of the above Question 22 2 / 2 pts A technique for creating images to communicate a message is _____.
rendering illustration visualization presentation Question 23 2 / 2 pts Agile project management is the preferred method for software projects. True False Question 24 2 / 2 pts Knowledge Transfer (KT) is iterative in nature. True False Question 25 2 / 2 pts An evaluation plan is a proposal that describes the process that will be used to guide an evaluation. True False Quiz Score: 40 o