TEST - CLCL 003A - PASSED
docx
keyboard_arrow_up
School
Defense Acquisition University *
*We aren’t endorsed by this school
Course
003A
Subject
Information Systems
Date
Feb 20, 2024
Type
docx
Pages
4
Uploaded by elizabethkegley
Test – CLCL 003A – Supply Chain Integration Credential Capstone Assessment
Passed 90% out of 100%
Q1 of Q20:
Which of the following provides authoritative, measurable, and testable requirements for the system development?
Life-Cycle Sustainment Plan (LCSP)
Capabilities Development Document (CDD)
Acquisition Strategy
Technology Development Strategy (TDS)
Q2 of Q20:
DMSMS Management can only begin after the weapon system has been fielded.
True
False
Q3 of Q20:
Which of the following is a challenge to Sense and Respond Logistics (S&RL)?
An agile supply chain is required
The best supply chains are rigid
A structured supply chain is required
Demand is ultimately unpredictable
Q4 of Q20:
IUID can be used by Engineers to associate the manufacturing and test data, maintenance history, and other information on individual items.
True
False
Q5 of Q20:
The use of DLA-operated storage and distribution facilities that are collocated with the DoD Component’s
selection of organic depot maintenance must be included in program plans.
True
False
Q6 of Q20:
Which of the following is a characteristic of Collaborative Planning, Forecasting and Replenishment (CPFR)?
Typically limited by the inability to align and communicate activities across organizations
Creates a Joint Business Plan that identifies the significant events that affect supply and demand in period
Involves identifying local procurement personnel
Monitored by commodity managers; supplier responds to any variance to goals
Q7 of Q20:
DMSMS applies only to Hardware. Software obsolescence is managed through the Software Obsolescence Exchange Program. (SOEP).
True
False
Q8 of Q20:
Source, Maintenance, Recoverability (SMR) coding is the technical process of establishing:
Methods of Support
Service Component Manager
Traceability in DLA-operated storage and distribution facilities
Unique item-level traceability
Q9 of Q20:
If a major deployment is impending, what would be the two most important factors in determining your transportation of materials? (select two)
Reliability of material delivery (i.e., right material to the right customer)
Suitability (i.e., parts can be physically transported)
Speed of material delivery (i.e., air vs maritime shipment0
Q10 of Q20:
Which three of the following elements could be included when designing a DLA PBL Value Proposition? (select three)
Leverage collaborative forecasting
Utilize Defense Working Capital Fund to minimize risk
Use Other Transaction Authority (OTA) to reduce unnecessary contracting requirements
Take advantage of parts and requisition visibility in real time
Q11 of Q20:
A company authorized to market, store, and ship on the manufacturer’s behalf is called an authorized distributor.
True
False
Q12 of Q20:
As the Strike Talon logistician, how would you use Item Unique Identification (IUID) to enable asset accountability, valuation, life-cycle management, and counterfeit materiel risk reduction? (select three)
Include the IUID requirements in subpart 252.211-7007 of DFARS
Ensure that purchases initiated by the DoD and executed through General Services Administration or other federal agencies comply with the IUID policy
Identify items with a unique item-level traceability requirement at any time in their life cycle using the procedures of DoDI 8320.04
Apply markings to all equipment with an acquisition cost of over $1,000 in accordance with DoDI
8320.06
Q13 of Q20:
Federal Acquisition Regulations prohibit DLA from supporting Performance Based Contracts established between the Program Office and Prime Vendor.
True
False
Q14 of Q20:
What are three characteristics of the relationship between RCM and CBM+? (select three)
RCM provides an understanding of the applicability and effectiveness of proposed CBM+ technologies
CBM+ encompasses the application of RCM
CBM+ provides an analysis of alternatives to RCM
RCM provides evidence of the need for CBM+ processes and technologies
Q15 of Q20:
The Weapon System Support Team (WSST) is an approach that DLA utilizes to deliver readiness to the warfighters’ weapon systems.
True
False
Q16 of Q20:
Which two of the following are processes found in the SCOR level 1 model?
Plan
Execute
Build and test
Source
Q17 of Q20:
Which of the following may cause Diminishing Manufacturing Sources and Material Shortages (DMSMS)?
Manufacturer discontinuation of a product
Natural disasters and war
Lack of government regulations
Depletion of source materials for manufacturing
Q18 of Q20:
Which three actions should you choose to support the “to be” supply chain model for Strike Talon? (select three)
Incorporate the best characteristics for “as-is” process
Include the best-in class characteristics from a leading practice
Develop a model stripped of unnecessary process steps
Obtain buy-in from stakeholders, customers, etc.
Q19 of Q20:
Although the filter of a general-purpose gas mask requires periodic replacement due to limited shelf life, the new filters were actually old ones that were relabeled and sold to the DoD. From this scenario, what three outcomes would you expect? (select three)
Failure to comply with government regulations
Mission failure and potential loss
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Customer returns / recalls
Product quality / reliability failures
Q20 of Q20:
Which two of the following are counterfeit inspection methods?
Look at the shipping label for anomalies
Verify the item is what was ordered
Vibration analysis
Heat resistance testing