Assessment Task Mod 1 2.9

docx

School

Royal Melbourne Institute of Technology *

*We aren’t endorsed by this school

Course

CPCC50210

Subject

Industrial Engineering

Date

Jan 9, 2024

Type

docx

Pages

2

Uploaded by MinisterIceFly32

Report
Assessment Task Scenario - Identify and produce estimated building and construction costs in the workplace This scenario covers Task 2.8 Calculate Quantities and Task 2.9 – Produce Cost Estimates This assessment is a real-work project where you have responsibilities for producing estimated costs for labour, materials, overheads and on-costs on various residential and commercial construction projects within their scope of work as a trade contractor or builder. For Tasks 2.8 and 2.9, refer to Project Portfolio for project no. 20361 – Retail Complex Download Project Portfolio for project no. 20361 – Retail Complex to determine the quantities of labour, materials, plant and equipment for the building, and develop estimates for the construction of the building. The developer who is developing the project 20361 Retail Complex has asked you for a price for part of the project. They want a price for the ground floor Cafe and the first floor residential unit only for the project. Grid at Grid B-C, 18-20. The inclusions and exclusions are detailed below. Inclusions: Structural block including to both levels of the structure and including along Grid 18 Wall framing for the ground floor of the café Rear Entry door to the unit on the ground floor Floor system between the ground floor and first floor Stairs to the ground to first floor Internal and external walls on the first floor. Windows and doors on the first floor Roof framing system on the first floor Roof Covering system on the first floor External finishes to the first floor Internal Lining Internal Fix Internal Finishes Electrical Cabinetry Waterproofing to the terrace Tiling to the terrace
Handrails Exclusions: Shop fitting to front elevation of the ground floor Café Fit out to the ground floor café Plumbing The ground slab for the shop and Café. North and south walls to shop 4 adjacent to the café. The Quote List for Project no. 20361 contains a number of supplier prices that have been attained for the project. These prices should be used in providing the estimate for the work. You may refer to BAA Constructions Rates Schedules, or you may choose to research current prices for the various items. The estimated time to complete the work quoted is 14 weeks from commencement to hand-over. You can use the BAA Project Estimating Template (Excel Workbook) to collate the information and calculate the price or you can use any other electronic estimating system you would prefer to use. The project will be allocated to a Supervisor who is a wage earning employee of the company. The supervisor has a company car and does not get a travel allowance. The supervisor works 48 hours per week and will have their time equally divided between four (4) projects including this project. The project will also use a labourer who is also a wage earner but gets paid a travelling allowance as they are not provided a vehicle. You can use the hourly rate template to determine this rate. These overhead costs will need to be calculated and included the price. Use the completed BAA Estimating Worksheets from assessment 2.8 and add in all the costing as mentioned in the inclusions (from the scenario) and add all the additional information from key requirements below to complete this task. You are required to answer all questions on the M1 Activity 2.9 - Answer sheet V1.0 Download M1 Activity 2.9 - Answer sheet V1.0 provided to you. Ensure you complete all required information
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help