Question 5 1 / 1 pts A quality control analyst for a lightbulb manufacturer is concerned that the time it takes to produce a batch of lightbulbs is too erratic. Accordingly, the analyst randomly surveys 5 production periods each day for 8 days and records the sample mean and range for each day. The data is presented in the table below. Suppose the analyst constructs an R chart to see if the variability in production times is in control. What is the upper control limit (UCL) for this R chart? Day X- Bar R 1 13.6 3.5 2 14.3 4.1 3 15.3 5.0 4 12.6 2.8 5 11.8 3.7 6 12.9 4.8 7 17.3 4.5 8 15.8 2.4 Total 113.6 30.8 7.18 8.14 6.84
7.82
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help